Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: DREDGED
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1977) 62 (1): 135–144.
Published: 01 February 1977
... REPLENISHMENT ARTIFICIAL DREDGED WALLS COASTAL NOURISHMENT SHINGLE SEA RECLAMATION COSTS SLOPES GRAVEL GROYNES BOURNEMOUTH PORTOBELLO UK Proc. Insrn Cio. Engrs, Part I, 1977, 62, Feb., 135-144 7917 DISCUSSION Beach replenishment: sea defences and a review of therole of artificial...
Journal Articles
Proceedings of the Institution of Civil Engineers (1969) 43 (1): 11–20.
Published: 01 May 1969
... method. 12. The harbour dredging was carried out usinga portable dredger with a rated output of 420 m3/h with a maximum pumping distance of 1500 m, without boosting, through a 300 mm pipe. In the area used for deposition of material during dredger trials silt with a highorganic contentwas deposited...
Journal Articles
R F LEGGET, A W SKEMPTON, L F COOLING, G A KELLAWAY, A L LITTLE, N D LEA, D A E MACDONALD, W H WARD, H B SUTHERLAND, J B BROWN, F L CASSEL, W K MAK, D R M HARDY, J G KNIBB, P G H BOSWELL
Proceedings of the Institution of Civil Engineers (1959) 13 (1): 93–117.
Published: 01 May 1959
.... It would be interesting to have more details of the contract. The last line of Q 29 seemed to suggest that the contractor had been reimbursed for the capital cost of his dredges, but Mr Little was not clear whether that was so or not. It was also mentioned that the work had been divided up between two 15...
