Keywords: FIDIC
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 627–665.
Published: 01 August 1989
...TW HULME; PHJ CHAPMAN; POK SHEUNG FOO; FIDIC © Thomas Telford and ICE 1989 FIDIC MASS RAPID TRANSIT CORP SINGAPORE MASS RAPID TRANSIT LTD MASS TRANSIT RAPID TRANSIT SYSTEMS PLANNING IMPLEMENTATION STUDIES RAILWAYS COUNTRIES DEVELOPING ROUTES SELECTION COSTS ESTIMATING...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (3): 731–753.
Published: 01 June 1986
...LW HINCH; DM MCDOWELL; PW ROWE; DA HUGHES; AB WOOD; JA CHANDLER; J PERAINO; RI FAIR; FIDIC © Thomas Telford and ICE 1986 FIDIC RIVERS CROSSINGS DESIGN FOUNDATIONS LINES CONSTRUCTION TRANSMISSION CAISSONS TOWERS CONDUCTORS BARRAGES STRUCTURES BRIDGES SCOUR CONTRACTS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 729–743.
Published: 01 August 1985
... if there is any delay in completion of the civil works. 37. The international nature of construction indicated that the use of FIDIC Conditions of Contract was appropriate and although their use is uncommon in Egypt this was acceptable to CWO. Application ofthe FIDIC Conditions foruse on the project necessitated...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 765–784.
Published: 01 August 1985
... onthiemprovement of secondary sewer systemswouldproceed with Cairo GOSD implementing and funding the smaller schemes. 52. In line with the general AMBRIC policy, the use of FIDIC Conditions of Contract was proposed for the USAID funded contracts. This was acceptable to bothCWOandUSAID,whoadvocatethe use...
Journal Articles

or Create an Account

Close Modal
Close Modal