Keywords: FRODSHAM
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1972) 52 (2): 149–162.
Published: 01 August 1972
... alongside railway tracks andall items must be carefully investigated, planned and controlled. 15. The Frodsham bridgepresented difficulties inexcavationbecause the cofferdams for the permanent and temporary supports were formed on both sides of the track; consequently there was no continuous trench across...
Journal Articles
Proceedings of the Institution of Civil Engineers (1971) 50 (2): 139–160.
Published: 01 October 1971
... FRAMES STIFFNESS MOMENTS INCLINED RAILWAYS STRUCTURES MATHEMATICS MATRIX HANGERS EQUATIONS SHEAR FRODSHAM CHESHIRE 7392 The design of inclined tied arch railway bridges over the M56 K. 1. MAJID, BSc, PhD, MICE,MIStructE' J. E. SPINDEL, BSc(Eng), PhD, ACGI. MlCEt M. S. WILLIAMS, BSc...

or Create an Account

Close subscription notice
Close access options