Skip Nav Destination
Close Modal
Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 104
Keywords: GATES
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Journal Articles
THE VICTORIA PROJECT, SRI LANKA: PROJECT PLANNING AND DESIGN OF VICTORIA DAM.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1991) 90 (2): 281–311.
Published: 01 April 1991
... GATES CREST OVERSPILL APRONS DIVERSION INSTRUMENTATION CONTRACTS SRI LANKA CEYLON ASIA © Thomas Telford and ICE 1991 VICTORIA MAHAWELI GANGA VICTORIA DAM P m . Inan Ciu. Enurs, Part 1, 1991,90, Apr., 281-311 PAPER 9520 \ The Victoria Pl'oject, Sri La project planning...
Journal Articles
KIAMBERE HYDROELECTRIC PROJECT, KENYA. PART 2: DESIGN.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 787–812.
Published: 01 August 1989
... a knoll of high ground next to the escarpment overlookingthe downstream reachof the gorge.In 790 Table l--continued K I A M B E R EP R O J E C T :D E S I G N Intake Height of structure Deck level No. of inlets Size of each gate opening Access bridge length (3 spans) Headrace tunnel Length Diameter...
Journal Articles
ALKALI-SILICA REACTION: KAMBURU SPILLWAY, KENYA, CASE HISTORY.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1988) 84 (6): 1213–1235.
Published: 01 December 1988
... an important part of Kenya s electricity supply system. The spillway, built in 1974, began to show unusual deformations eight years after completion. Extensive cracking and deformations large enough to prevent the full operation of the spillway gates were found. Laboratory and site investigations confirm...
Journal Articles
FLOOD ALLEVIATION SCHEME FOR LOWER RIVER MOLE.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1988) 84 (2): 235–263.
Published: 01 April 1988
... BRIDGES COSTS SLUICES NAPPE OSCILLATIONS RADIAL GATES ANCHORAGES CONTRACTS LANDSCAPING CONDITIONS FIFTH EDITION SURREY SUSSEX ENGLAND RIVER MOLE UK Proc. Instn Ciu. Engrs, Part 1,1988.84, Apr., 235-263 9160 GROWUAPTER ENGINEERING Flood alleviation scheme for Lower River Mole W...
Journal Articles
LOCK CONSTRUCTION AND REALIGNMENT ON THE SHEFFIELD AND SOUTH YORKSHIRE NAVIGATION. DISCUSSION.
Available to PurchaseT MANN, M DUNN, C FORD, H OSBORN, M CLIFT, RE WEST, PD HUNTER, G HAIDER, BP WILLIAMS, RJT BENNETT, C PRIOR, MD JAPES
Proceedings of the Institution of Civil Engineers (1987) 82 (4): 1203–1215.
Published: 01 August 1987
... GROUNDWATER TRAFFIC COSTS ECONOMICS FINANCE TESTS LOADS GROUND ANCHORS GATES SLUICES SHEFFIELD SOUTH YORKSHIRE UK Proc. Instn Ciu. Engrs, Part 1, 1987,82, Dec., 1203-1215 9085 DEMINSAGCRUINISTESIEMIORENING GROUP Lock construction and realignment on theSheffield and South Yorkshire...
Journal Articles
TUAS SHIPYARD, SINGAPORE. DISCUSSION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1987) 82 (4): 871–879.
Published: 01 August 1987
...IM VARLEY; DS BYROM; HD OSBORN; M THOMAS; DGM ROBERTS; PD STEBBINGS; GP MEANLEY; P CONWAY; JB TERRY © Thomas Telford and ICE 1987 SHIPYARDS STRUCTURES DRY DOCKS STEEL CORROSION GATES DRAINAGE CONTRACTS CRANES DESIGN WALLS WATER PUMPS AIR HAULING IN PIERS TENDERS TURNKEY...
Journal Articles
LOCAL SCOUR CAUSED BY SUBMERGED WALL JETS.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1986) 81 (4): 607–645.
Published: 01 December 1986
... STRESS LAYERS ESTIMATING METHODS BOUNDARY LAYERS SLUICES CONDITIONS GATES PIPES HYDRAULICS PROCEDURE MEASUREMENT VOLUME PATTERNS CHARACTERISTICS FIXED BEDS MODELLING FLOW Proc. lnstn Ciu. Engrs, Part 2, 1986,81, Dec., 607-645 PAPER 9077 WATERGERNOGUIPNEERING Local scour causedby...
Journal Articles
LOCK CONSTRUCTION AND REALIGNMENT ON THE SHEFFIELD AND SOUTH YORKSHIRE NAVIGATION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1986) 80 (5): 1183–1210.
Published: 01 October 1986
... FILLING COMPUTERS EQUIPMENT PROGRAMS SIMULATION STRUCTURAL SOILS PARAMETERS INVESTIGATIONS WALLS TIMING GATES MANAGEMENT PROJECTS COSTS RETAINING GROUND ANCHORS STAFF CONTROL REMOTE SHEFFIELD YORKSHIRE SOUTH YORKSHIRE SYKEHOUSE LOCK RAWMARSH ROTHERHAM UK Proc. Instn...
Journal Articles
TUAS SHIPYARD, SINGAPORE.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1986) 80 (4): 903–930.
Published: 01 August 1986
... CONTRACTS FEASIBILITY SITE INVESTIGATION PROCEDURE GATES COFFERDAMS EXCAVATIONS FLOORS CONCRETE PLACING REGULATIONS SAFETY LABOUR TUAS SINGAPORE TUAS SHIPYARD SINGAPORE Proc. lnstn Cio. Engrs, Part 1, 1986,80, Aug., 903-930 9075E Tuas shipyard, Singapore ENGINEERING GROUP...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 81 (2): 301–303.
Published: 01 June 1986
...JD HARDWICK; MJ KENN; DS WEAVER; REYNOLDS © Thomas Telford and ICE 1986 PROGRESSIVE GATES MODELLING STUDIES VIBRATIONS FLOW INDUCED TESTS TESTING MODELS DESIGN DATA RESEARCH HOLES FLOODING DRAINAGE RADIAL BARRIERS METHODS LOADS NATURAL FREQUENCIES RESPONSES...
Journal Articles
INFORMAL DISCUSSION. SOME RECENT WORKS ON INLAND WATERWAYS.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (6): 1504–1507.
Published: 01 December 1985
...G HAIDER; DJ WILKINSON UK INLAND WATERWAYS CANALS GOVERNMENT GRANTS FUNDING FINANCE RESERVOIRS RENEWAL BRIDGES STRUCTURES MINING WATER RESOURCES WATER RESOURCES REPAIRS COSTS MAINTENANCE SEEPAGE PUDDLE CLAYS PUDDLE CLAY GATES ECONOMICS BRITISH WATERWAYS BOARD...
Journal Articles
PROGRESSIVE GATE-MODELLING FPR STUDIES OF FLOW-INDUCED VIBRATION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 79 (3): 483–509.
Published: 01 December 1985
...JD HARDWICK PROGRESSIVE GATES MODELLING STUDIES FLOW INDUCED VIBRATIONS SPANS RADIAL PREDICTION BARRIERS RIVERS TECHNIQUES MODELS DESIGN PROTOTYPES FLOODING STRUCTURES INTERACTION DRAINAGE HOLES FREQUENCY DAMPING RESPONSES POWER DISSIPATION STILLING POOLS LEVELS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 79 (4): 753–757.
Published: 01 December 1985
...DG WARDLE; DA CROW; MJ KENN; JD HARDWICK; REYNOLDS © Thomas Telford and ICE 1985 IMPERIAL COLLEGE HYDRAULIC FORCES RAILS LIFT VERTICAL HIGH HEADS GATES FLOW MODELS PATTERNS VELOCITY SLOTS TESTS TANKS STUDIES AHLBORN WATER REYNOLDS NUMBERS TWO DIMENSIONAL THREE...
Journal Articles
HYDRAULIC FORCES ON RAILS FOR VERTICAL LIFT, HIGH HEAD GATES.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 79 (1): 73–85.
Published: 01 March 1985
...DG WARDLE; DA CROW Proc. Instn Ciu.Engrs, Part 2, 1985,79, Mar.,73-85 PAPER 8849 WATERGERNOGUIPNEERING Hydraulic forceson rails for vertical lift, high headgates D. G. WARDLE, BSc(Eng), ACC-I,MICE, DipHE(Delft)* D. A. CROW, BSdEng)? Vertical lift gates,operatingunder high differentialwaterheads...
Journal Articles
DUGALD CLERK LECTURE: THE THAMES BARRIER.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (1): 15–25.
Published: 01 February 1985
... in the navigation openings, so as not torestrict navigation (e) adequate overhead clearanceto be provided 18 THAMESBARRIER (f)cross section olthe waterway not to be reduced by more than 25 per cent by thepermanentstructure,although 30 per centpermitted during construction (g) closure ofall gates to be achieved...
Journal Articles
BARKING CREEK TIDAL BARRIER. DISCUSSION.
Available to PurchaseRT GERRARD, JJ LONG, HR SHAH, KG WEEKS, TA CLARK, DF ROSE, MP KENDRICK, JH FLEMING, JH WOMERSLEY, AO MITCHELL, EA HEPPLEWHITE, JD HARDWICK, WD WEBSTER
Proceedings of the Institution of Civil Engineers (1983) 74 (3): 525–541.
Published: 01 August 1983
...RT GERRARD; JJ LONG; HR SHAH; KG WEEKS; TA CLARK; DF ROSE; MP KENDRICK; JH FLEMING; JH WOMERSLEY; AO MITCHELL; EA HEPPLEWHITE; JD HARDWICK; WD WEBSTER UK BARKING CREEK THAMES HULL CREEKS TIDAL BARRIERS DESIGN CONSTRUCTION WATER AUTHORITIES ERECTION GATES MACHINERY SILT...
Journal Articles
BARKING CREEK TIDAL BARRIER.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1982) 72 (4): 533–562.
Published: 01 November 1982
... the 300 t navigation span gate which is believed to be the largest vertical-lift gate in tUhKe . Introduction Barking Creek on the northbank of the River Thames is the tidal part of the River Roding. At Creekmouth it forms a boundary between the London Boroughs of Newham and Barking. The creek is used...
Journal Articles
MJ KENN, AD GARROD, M BALDASSARRINI, GM BINNIE, JS BURGESS, MH PALMER, KS SMITH, IP HAIGH, WDC MURRAY, PHD HANCOCK, P ACKERS, C JAEGER, DS MILLER, REA ARNDT, J LOWE, PC CHAO, AR LUECKER, REYNOLDS
Proceedings of the Institution of Civil Engineers (1981) 70 (4): 779–810.
Published: 01 November 1981
... for by the subsequent Row conditions. 89. Onceimpoundinghadbegunthetunnelgatesandgatehoistsbecame inaccessible. Consequently the gate positions could be estimated only to within about 1 ft and there was no direct evidence of either the water levels or the Row conditions inside the tunnels. 90. The tunnel outflow...
Journal Articles
THE RIVER HULL TIDAL SURGE BARRIER.
Available to PurchaseJH FLEMING, G RUKIN, JA TEBBENHAM, WD WEBESTER, HR SHAH, PH MCMILLAN, OJ COX, H WALKER, AT PEPPER, JR GWYTHER, BP WILLIAMS, AH BECKETT, JH WOMERSLEY, DW CALKIN
Proceedings of the Institution of Civil Engineers (1981) 70 (3): 581–591.
Published: 01 August 1981
..., the barrier has taken on as much the characteristics of a public monument as of a utilitarian river control structure, and close collaboration between Engineer and Architect was needed to ensure that both functions were fulfilled; combining a turnover lifting gate with slender and elegant supporting towers...
Journal Articles
CAVITATION DAMAGE AND THE TARBELA TUNNEL COLLAPSE OF 1974.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1981) 70 (1): 65–89.
Published: 01 February 1981
...MJ KENN; AD GARROD © Thomas Telford and ICE 1981 IMPERIAL COLLEGE BINNIE AND PARTNERS TARBELA JOINT VENTURE CAVITATION COLLAPSE DISCHARGES VELOCITY CONDUITS VORTICITY SHEAR WALLS ROCKS MECHANISMS RATES HYDRAULICS LEVELS DAMAGE RESERVOIRS GATES CONCRETE...
1
