Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: LUNE
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
J KENNARD, M F KENNARD, A W BISHOP, P R VAUGHAN, A L LITTLE, T N W AKROYD, N J RUFFLE, D H TROLLOPE, R J COURT, S SEROTA, J K HUNTER, H H DIXON, R H CUTHBERTSON, P O WOLF, S ROBIN, R C S WALTERS, ROW
Proceedings of the Institution of Civil Engineers (1962) 23 (4): 726–765.
Published: 01 December 1962
... of work. The Selset Reservoir didnot fully utilize the whole of the Lune and Balder catchments but the subsequent construction of Balderhead Reservoir, which was designedas a regulating reservoirto provide water in theriver Tees for pumping out in themiddle reaches, would makefull economic use...
Journal Articles
Proceedings of the Institution of Civil Engineers (1962) 21 (2): 305–346.
Published: 01 February 1962
... samples were taken in 1954 at four levels in the 40 ft cliff face cut by the river Lune at the edgeof the borrow pit. Thethreelowersamplesweremixed to forma representative batchfor a seriesof triaxial tests with pore-pressure measurement to determine the strength characteristicsin terms of effective...
Journal Articles
Proceedings of the Institution of Civil Engineers (1962) 21 (2): 277–304.
Published: 01 February 1962
... the carrying out of special protective measures,which are described, and the overflow works and control of the water are dealt with shortly. Construction commenced in June 1955 and the reservoir first filled in July 1960. The cost of the dam was £3,200,000. SELSET LUNE TEES DURHAM UK Paper...
Journal Articles
Proceedings of the Institution of Civil Engineers (1958) 9 (3): 193–216.
Published: 01 March 1958
...CC INGLIS; FJT KESTNER; HRS WYRE LANCASHIRE ENGLAND LUNE UK © Thomas Telford and ICE 1958 HYDRAULICS RESEARCH STATION HRS WALLS ESTUARIES TRAINING RECLAMATION RIVERS WEIRS DREDGING CONSTRUCTION SURVEYING WORKS EROSION CONTINUOUS MODELS MODELLING...
