Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: M54
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
TELFORD MOTORWAY M54 - PLANNING, DESIGN AND CONSTRUCTION. DISCUSSION.
Available to PurchaseAN BRANT, SH ROGERS, JM CARRINGTON, FJ PARKER, OT WILLIAMS, RJ BRIDLE, JV BARTLETT, ACE SANDBERG, WR KEMP, D WHITFIELD, R REES JONES, R R JONES, DE GLYN-WOODS, DE GLYN- WOODS, EC HAMBLY
Proceedings of the Institution of Civil Engineers (1986) 80 (1): 251–261.
Published: 01 February 1986
... ENVIRONMENTAL TREATMENT IMPACT NOISE CONCRETE PAVEMENTS SURFACE STANDARDS M54 PLANNING DESIGN POLITICS CONSTRUCTION NEW TOWNS ENVIRONMENT LAND VALUE LANDSCAPING COSTS PUBLIC ECONOMICS LANES CONSULTATION INQUIRIES LANDSCAPE TREES STRUCTURES BRIDGES TELFORD UK Proc. Instn...
Journal Articles
CORRIGENDUM. TELFORD MOTORWAY M54 - PLANNING, DESIGN AND CONSTRUCTION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (1): 218.
Published: 01 February 1985
...AN BRANT; SH ROGERS; JM CARRINGTON © Thomas Telford and ICE 1985 MOTORWAYS M54 DESIGN PLANNING CONSTRUCTION RAILWAYS LOCATION TELFORD UK unlikely to be as large ashas been assumed onthe basis of low-cycle tests on newly manufactured spiral strand. An appraisal...
Journal Articles
TELFORD MOTORWAY M54 - PLANNING, DESIGN AND CONSTRUCTION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1984) 76 (4): 883–907.
Published: 01 November 1984
... it changed considerably during the 16 years. The joint Authors arethe responsible Director and Project Manager of the Department of Transport, and Partner of Sir Owen Williams and Partners, the consulting engineers responsible for the route location, design and construction of the M54 motorway. Introduction...
Journal Articles
INFORMAL DISCUSSION. INTEGRATION OF A MOTORWAY INTO THE NATURAL ENVIRONMENT.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1977) 62 (1): 183–185.
Published: 01 February 1977
...MN WHELAN; JC MILES © Thomas Telford and ICE 1977 DEPARTMENT OF ENVIRONMENT INTEGRATION ENVIRONMENT EFFECT POLLUTION LANDTAKE CASE STUDIES ASSESSMENT MOTORWAYS FACTORS NOISE AIR ROUTES M54 LANDSCAPE NATURAL VISUAL VIBRATIONS SELECTION ROADS TELFORD UK...
