Keywords: NOISE
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1991) 90 (6): 1255–1277.
Published: 01 December 1991
... STIFFNESS PILES FLEXIBILITY BASEMENTS FOUNDATIONS LONDON CLAY NOISE VIBRATIONS DIAPHRAGM WALLING BEHAVIOUR PROPPED ANALYSIS Proc. Instn Civ. Enyrs, Part 1, 1991, 90, Dec., 1255-1277 958E5NDGIRISNCOEUESNRSDIINOGN GROUP Use of sheet pile retaining walls for deep excavations in stiff clay D. M...
Journal Articles
Proceedings of the Institution of Civil Engineers (1991) 90 (5): 963–974.
Published: 01 October 1991
...C F BONNETT; DLR © Thomas Telford and ICE 1991 LONDON TRANSPORT INTERNATIONAL DOCKLANDS LIGHT RAILWAY DLR TRACK RAILWAYS LIGHTWEIGHT ACCESS NOISE VIBRATIONS ENGINEERING TRACKWORK DESIGN CONSTRUCTION PERMANENT WAY METROS LIGHT RAIL URBAN ENVIRONMENT LOADS PROBLEMS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1991) 90 (4): 959–961.
Published: 01 August 1991
...D ATHERTON; P D JACKSON; R COWELL; R SMITH; P W FRIEND © Thomas Telford and ICE 1991 CLOSE TOLERANCES STRUCTURES SPECIFICATIONS PERFORMANCE VIBRATIONS NOISE TRANSMISSION GEOMETRY DIMENSIONS BUILDINGS VACUUM DEWATERING ISOLATION Proc. Instn Cio. Engrs, Part 1, 1991, 90, Aug...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1990) 88 (4): 705–714.
Published: 01 August 1990
...R CLARE; I D MAYS © Thomas Telford and ICE 1990 DEVELOPMENT WIND MACHINERY ENERGY NOISE VERTICAL TURBINES OFFSHORE TOWERS AXIS VAWT TECHNOLOGY BLADES hoc. Instn Ciu. Engrs, Part 1, 1990,88, Aug., 705-714 NGGDERINIOSEUCREPUGRSIYSN9I4OG4N3E Development of vertical axis wind...
Journal Articles
Proceedings of the Institution of Civil Engineers (1990) 88 (3): 491–493.
Published: 01 June 1990
...JC FERGUSSON; RM TAY;LOR; JE WHITBREAD; JMR DUTTON LONDON UNDERGROUND BRITISH RAILWAYS BOARD BRITISH RAIL RAILWAYS NOISE VIBRATIONS DESIGN RAILS TRACK REDUCTION ENVIRONMENTAL POLLUTION Proc. lnstn Civ. Engrs, Part 1,1990,88,June, 491-493 INFORMAL DISCUSSION...
Journal Articles
Proceedings of the Institution of Civil Engineers (1990) 89 (2): 207–224.
Published: 01 June 1990
... NOISE SIGNALS GENERATION TESTS PROCEDURE SPECTRUM TECHNIQUES LABORATORIES MICROPROCESSORS Proc. lnstn Cio.Engrs, Part 2,1990,89, June, 207-224 PAPER 9521 COMPUTAEPRPLICATIONS AND METHODS GROUP Computer-controlled simulationof short-crested seas B. T. LINFOOT, BEng, EurIng, MICE* I. G. BRYDEN...
Journal Articles
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 667–707.
Published: 01 August 1989
... to noise suppression noted and the final choice of three specific types is described. The requirements dictating the form and location of other structures are mentioned. The effect of geotechnical considerations on design is described. The effect of the contract formsdesign and construct, consultants...
Journal Articles
Proceedings of the Institution of Civil Engineers (1989) 86 (1): 235–242.
Published: 01 February 1989
... PAVEMENTS CONSTRUCTION UPGRADING LOADS AXLES LEGISLATION MANAGEMENT TRAINS NOISE SPECIFICATIONS FINANCE TOLLS AUSTRALIA h o c . lnstn Civ. Engrs, Part 1,1989,86,Feb.,235242 DIS9C3U2T5SRSAIONNSPORTEANTGIOINNEGERROINUGP The Australian National Highway N. A. Waslin and J. D. A. Widdup Mr J...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (5): 939–964.
Published: 01 October 1988
... section was chosen that offered a minimum construction depth in a situation where headroom clearanceswere critical. 64. At the Clan-y-Wern site the services are accommodated in the roadway thus requiringa reinforced wncrete portalstructure. Noise barriers 65. Noise levels were computed both in regard...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (6): 1541–1566.
Published: 01 December 1986
... taxiways and without improvement the main runway would habveeen at capacity by1990. The consultants therefore recommended that a full length parallel taxiway should be provided which would also improve safety and this advice was accepted. Noise 10. Noise at Birmingham Airport arises from two main sources...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (5): 1363–1383.
Published: 01 October 1986
... CONSTRUCTION MONITORING GAUGES NOISE MOVEMENT MEASUREMENT PROCEDURE STRAIN STRUCTURAL COMPLIANCE PARAMETERS CONSENTS COSTS PERMANENT PRESSURE POINTING WALLS CLOSURES SOILS PIPES SITE INVESTIGATION SURVEYS INVESTIGATIONS UNDERWATER DIVERSION METHODS HYDROLOGY REMOVAL STRUCTURES...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (2): 367–384.
Published: 01 April 1986
... of the main building structure is followed by an outline of the design of the Departures forecourt and access ramps, the LRT Underground station and the multi-storey short term car park. The road bridges, embankments and apron pavements and noise barriers are also described. Introduction In May 1978, Scott...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (1): 251–261.
Published: 01 February 1986
... ENVIRONMENTAL TREATMENT IMPACT NOISE CONCRETE PAVEMENTS SURFACE STANDARDS M54 PLANNING DESIGN POLITICS CONSTRUCTION NEW TOWNS ENVIRONMENT LAND VALUE LANDSCAPING COSTS PUBLIC ECONOMICS LANES CONSULTATION INQUIRIES LANDSCAPE TREES STRUCTURES BRIDGES TELFORD UK Proc. Instn...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (1): 111–119.
Published: 01 February 1986
..., diving, use of Cymag for rabbit control,noise and detonators. 18. Accidents canoccuras in most construction works. Workingon rough uneven groundcancauseaccidentssuchastrippingandthetracksandthe pathwayalongsidethem(the cess) can be particularlyhazardous.Unloading equipment and materialsfrom vehicles...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (5): 1065–1083.
Published: 01 October 1985
... Table 3. Scheme ranking Engineering costs Road standard Road benefits Effect on the physical development of Pitlochry View from the road Noise pollution and visual intrusion Effect on Pitlochry as a tourist centre Agricultural impact Effect on property Traffic disruption during construction BYPASS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 76 (4): 883–907.
Published: 01 November 1984
... the most affected areas visual envelope plans, i.e. areas from within which traftic on the motorway could be seen (Figs 4 and 5), and noise 890 TELFORD MOTORWAYM54 V Teltord motorway M54 -Llne of M54 F i g . 5. Visual envelope-modified route contour plans were prepared based on the published scheme...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (1): 87–91.
Published: 01 February 1983
...RW SARSBY; HC SHELBOURNE; WA DAWSON; AEJ SELFE; JD HARRISON; DB ONEILL; RA HOOD; JW BIELOUS © Thomas Telford and ICE 1983 ROADS PILING NOISE SHEETPILING M67 SYSTEMS MOTORWAYS SCREENING VIBRATIONS PILES DAMAGE VIBRATORY DRIVING Proc. Instn Ciu. Engrs, Part 1, 1983,74, Feb.,87...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (1): 99–122.
Published: 01 February 1983
... and aboutits behaviour under traffic. From my own observation, the noise experienced by passengers (in the cars or when standing on the platforms) appears to be acceptable, and probably less than in London. I should also be interested to learn of the reaction of occupants of buildings near the tunnels...
Journal Articles
Proceedings of the Institution of Civil Engineers (1982) 73 (2): 493–512.
Published: 01 June 1982
... affected? Paper published: Proc. Instn Ciu. Engrs, Part 2, 1981, 71, June, 287-304. 493 DISCUSSION 78. One thing for concern isthe absence of air pollutionin tables 2 and 3 of the Department of Transport s frameworks for trunk road appraisal. I have been involved in noise for years but I would question...

or Create an Account

Close subscription notice
Close access options