Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: ON COSTS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
C K HASWELL, M W LEONARD, W A FITZHERBERT, A GOLDSTEIN, R L TRIGGS, C V C ELLIOTT, T W WEDDELL, W R BRIGGS, H W MCAUGHTRY, J F REEVE, V H GRITTON, D P BERTLIN, T M MEGAW, A J EDNEY, W G MITCHELL, MAN
Proceedings of the Institution of Civil Engineers (1964) 27 (1): 192–231.
Published: 01 January 1964
... in the tender, had thatparticular item been included in theoriginal bill of quantities. (b) That any increase in the volume of work to be executed should not be allowed for; this means thatthere would be no reduction in thestaticon-cost covered in the tender p~ice. Thus it was accepted that, with all other...
Journal Articles
Proceedings of the Institution of Civil Engineers (1963) 24 (2): 223–234.
Published: 01 February 1963
...C K HASWELL © Thomas Telford and ICE 1963 SIR WILLIAM HALCROW RATES FIXING CIVIL ENGINEERING CONTRACTS MANAGEMENT METHODS CONDITIONS CLAUSES COSTS DIRECT MATERIALS LABOUR PLANT CONTRACTORS ON COSTS INDIRECT OVERHEAD PROCEDURE TENDERS BOUNDARIES TENDERING LOSS...
