Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: OPEN CUT
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
TYNE AND WEAR METRO: DESIGN AND CONSTRUCTION OF TUNELLING WORKS AND UNDERGROUND STATIONS..
Available to Purchase
Proceedings of the Institution of Civil Engineers (1981) 70 (4): 695–725.
Published: 01 November 1981
... COAL INVESTIGATIONS TREATMENT LININGS CUT AND COVER OPEN CUT URBAN AREAS NEWCASTLE GATESHEAD TYNE AND WEAR UK Proc. Instn Civ.Engrs, Part 1,1981,70, Nov., 695-725 8515 Tyne and Wear Metro: design and construction of tunnelling worksand underground stations S. G.TOUGH, BSC, FICE...
Journal Articles
THE BRISTOL REGIONAL FOUL WATER DRAINAGE SCHEME.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1967) 38 (4): 595–620.
Published: 01 December 1967
...P H STEEL UK BRISTOL REGIONAL DRAINAGE SEWAGE DESIGN TUNNELS SIPHONS PIPEJACKING JACKING PIPES GRADIENTS INTERCEPTOR FOUL SEWERS TREATMENT SYSTEMS OPEN CUT EFFLUENT CONTRACTS CULVERTS WATER TRUNK WORKS CONSTRUCTION PUMPING STATIONS OUTFALLS TARGET INVERTED...
Journal Articles
Proceedings of the Institution of Civil Engineers (1966) 33 (2): 313–321.
Published: 01 February 1966
...M M HANNA; A L MARSHALL; S D AGOSTINO; D G ALCOCK © Thomas Telford and ICE 1966 SUNDERLAND TECHNICAL COLLEGE NAPLES UNIVERSITY ICT STRESS CIRCULAR PIPES BURIED OPEN CUT LOADS ASSESSMENT EQUATIONS VERTICAL HORIZONTAL MATHEMATICS COMPUTERS DEFORMATION DISPLACEMENT...
Journal Articles
THE INTRODUCTION OF TUNNELLING FOR THE CONSTRUCTION OF LARGE-DIAMETER SEWERS IN KINGSTON-UPON-HULL.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1957) 6 (4): 758–769.
Published: 01 April 1957
... OPEN CUT HULL UK © Thomas Telford and ICE 1957 768 ROBERTS A N D LUCAS ON THE INTRODUOTION OF TUNNELLMU FOR Paper No. 6174 THE INTRODUCTION OF TUNNELLING FOR THE CONSTRUCTION OF LARGE-DIAMETERSEWERS IN KINGSTON-WON-HULL by * Geofky Winston Roberts, M.I.C.E., and WiUiam Harold Lucas...
