Keywords: OVERSPILL
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1991) 90 (2): 281–311.
Published: 01 April 1991
... and slowly filling the float well from an external source to prove theopening sequence, and then slowly drainingthe well to prove the closing sequence. In asimilar manner, the back-upelectrical controls can be verified. Design of crest overspill 41. Thegated crest overspill is located centrally onthearch...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 85 (3): 435–455.
Published: 01 September 1988
... STILLING PONDS MODELS STORAGE OVERSPILL REDUCTION SEDIMENTATION MAINTENANCE IN SITU FREQUENCY Proc. Instn Cio. Engrs, Part 2,1988,85, Sept., 435-455 PAPER 9283 WATERGERNOGUINP EERING Rectangular shaft configuratiofnor storm sewage overflow structures R. BURROWS, BEng, PhD, MICE* K. H. M. ALI...

or Create an Account

Close subscription notice
Close access options