Keywords: PREPILED
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (1): 195–216.
Published: 01 February 1985
.... Prepiled trench 33. To overcome the problem of toeing-in sheet pileswhen drivingcom- menced, it was decided to remove boulder obstructions along the piling line by excavating a trench about 2.5 m deep and backfilling this with site-won sand. By this method it was found possible for pile driving to achieve...

or Create an Account

Close Modal
Close Modal