Skip to Main Content
Keywords: PUMPED
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (3): 445–474.
Published: 01 June 1988
...WJ DICKENS; IH BENSTED © Thomas Telford and ICE 1988 THAMES WATER WATER SUPPLY SYSTEMS SUPPLY WATER TRUNK DISTRIBUTION POTABLE MAINS RETICULATION SOURCES TREATMENT WORKS URBAN REPLACEMENT AGEING AREAS LONG TERM PLANNING RELIEF RING RINGS PUMPED PUMPS GRAVITY...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (4): 945–967.
Published: 01 August 1986
... support the water supply abstraction requirementsof 1365 Ml/day for79 days during even a poorwet season. 29. At Piseaweirhasbeenconstructed across the river to form a pond for abstraction purposes. A pumping station has been constructed and plant is being Stage 1 Stage 2 Stage 3 Stage 4 Presettlement...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 919–957.
Published: 01 August 1985
...-957 8739 DISCUSSION Dinorwig pumped storage scheme J. A. Baines, V. G. Newman, I. W. Hannah, T. H. Douglas, W. J. Carlyle, I. L. Jones, D. M. Eaton and G. Zeronian Dr A. D. M. Penman, Geotechnical Consultant I would like to describe thedeflection measurements that I made while I was still...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (3): 495–513.
Published: 01 August 1983
... design method is proposed. The most economical flyash proportion in the mix is generally 4&60% of the volume of the cementitious content for an immersion-vibrated concrete, and 7&85% for a roller-compacted concrete. Two placements of pavement-quality concrete in roads and aplacement of pumped concrete...
Journal Articles
Proceedings of the Institution of Civil Engineers (1967) 36 (4): 721–768.
Published: 01 April 1967
... CONDITIONS PIERS LOADS FOUNDATIONS PRESSURE SETTLEMENT ABUTMENTS SPANS FATIGUE DECKS WATERPROOFING SHEETPILING FABRICATION SHAFTS FORMWORK CONCRETE DEFLECTION SAFETY MIX PUMPED GROSVENOR BRIDGE LONDON THAMES UK THE RECONSTRUCI'ION OF THE GROSVENOR RAILWAY BRIDGE by 01...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1955) 4 (4): 472–502.
Published: 01 July 1955
...T G N HALDANE; P L BLACKSTONE © Thomas Telford and ICE 1955 PROBLEMS HYDROELECTRICITY HYDROELECTRIC DESIGN THERMAL SYSTEMS PLANT PLANNING PUMPED STORAGE PUMPED STORAGE ECONOMICS CAPACITY LOADS STORAGE NUCLEAR POWER PRICES COSTS WATER TURBINES GENERATORS TRANSMISSION...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1954) 3 (4): 564–579.
Published: 01 July 1954
...N S BOULTON © Thomas Telford and ICE 1954 WATER TABLE DRAWDOWN PUMPED WELLS UNCONFINED FORMATION AQUIFERS ANISOTROPIC PERMEABILITY EQUATIONS VERTICAL PERMEABILITY HORIZONTAL 564 BOULTON ON THE DRAWDOWN OF THE WATER-TABLE Paper 5979 The Drawdown of the Water-Table under Non...

or Create an Account

Close Modal
Close Modal