Keywords: RECLAMATION
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1990) 88 (4): 531–549.
Published: 01 August 1990
...CHIN FUNG KEE; R MCCABE © Thomas Telford and ICE 1990 JURUTERA KONSULTANT HOWARD NEEDLES TAMMEN & BERGENDOFF PENANG BRIDGE FOUNDATIONS CONSTRUCTION SOILS ISLANDS MARINE PRESTRESSED LOADS CONTROL COUNTRIES BRIDGES RECLAMATION GEOTECHNICS INTERCHANGES EMBANKMENTS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1990) 88 (4): 679–686.
Published: 01 August 1990
... GOVERNMENT TOWNS RECLAMATION MANAGEMENT NEW TOWNS PLANNING TUEN MUN HONG KONG HONG KONG ASIA Proc. Insfn Cio. Engrs, Part 1, 1990,88, Aug., 679-686 IONS 9427 GROUP Developmentof Tuen Mun New Town, Hong Kong D. R. Butler and R. A. McKittrick G.B. O Rorke Former Director of New...
Journal Articles
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 603–625.
Published: 01 August 1989
... MunNew Town and the Paper deals with the manyand varied facets of this task. Planning: major reports 10. Variousstudieswere undertaken to establish the feasibility of the new town and thebasic planning objectives forits development. Report on reclamation at Castle Peak Bay (1959) . 11. In May1959 SWK...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (6): 1269–1288.
Published: 01 December 1988
... whether there would have been a problem in the first place, and whether the care that was taken to avoid it was worthwhile. Such care is, however, definitely worthwhile, as experience of a reclamation site on the opposite side of To10 Harbour, close to theroadand having similar ground conditions, has...
Journal Articles
Proceedings of the Institution of Civil Engineers (1987) 82 (3): 527–549.
Published: 01 June 1987
.... Construction of the marine embankment and adjacent reclamation involved the removal by dredging of 3 million m3 of soft marine clay and deposition of about7 million m3 of submersible and compactablefill.Beforedredging startedan extensive site investigation was carriedout to determine the extent to which soft...
Journal Articles
Proceedings of the Institution of Civil Engineers (1987) 82 (3): 507–525.
Published: 01 June 1987
...AA BOWLEY; PM MARTIN; IM MORRISON © Thomas Telford and ICE 1987 PETER FRAENKEL CONSULTANTS(HK) LTD PETER FRAENKEL & PARTNERS ROADS COASTAL COASTS DESIGN SOILS INVESTIGATIONS EMBANKMENTS MARINE EARTHWORKS LAND RECLAMATION PROJECTS CLAYS DRAINAGE RAINFALL PAVEMENTS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (4): 903–930.
Published: 01 August 1986
...IM VARLEY; DS BYROM SHIPYARDS PLANNING DESIGN CONSTRUCTION SHIPS REPAIRS RECLAMATION FORESHORES PROJECTS PIERS DRY DOCKS OFFICES WORKSHOPS AMENITIES BUILDINGS INFRASTRUCTURE VESSELS QUAYS STUDIES MANAGEMENT CONTRACTS FEASIBILITY SITE INVESTIGATION PROCEDURE GATES...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (6): 1463–1470.
Published: 01 December 1985
... COUNTRIES DEVELOPING DREDGING RECLAMATION DESIGN CONSTRUCTION PILES TIES CORROSION MAINTENANCE CHANNELS SHEET CONCRETE INSTALLATION CONTAINERS SAPELE NIGERIA AFRICA Proc. lnstn Civ. Engrs, Part 1, 1985,78, Dec., 1463-1470 8791 DMISACRUISTSIMIOEN E N GGIRNOEUE RP I N G The new...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 77 (3): 311–322.
Published: 01 September 1984
... FINITE DIFFERENCE EFFECT EARTH ROTATION BEDS FRICTION SURFACE WIND STRESS TURBULENCE EXCHANGE MIXING TIDES CONCENTRATION DEVIATION MEAN RESEARCH LATERAL EFFICIENCY INFILL GEOMETRY TIME VARIATIONS DIFFERENTIAL INITIAL CONDITIONS BRIDGES RECLAMATION EMBANKMENTS VELOCITY DEPTH...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 77 (3): 387–395.
Published: 01 September 1984
...T CAIRNEY © Thomas Telford and ICE 1984 LIVERPOOL POLYTECHNIC LAND CONTAMINATION CHEMISTRY RECLAMATION METHODS TECHNIQUES DESIGN INSULATION BLANKETS SOLUBLE WATER COVERS VEGETATION DRAINAGE IMPROVEMENT GROUNDWATER QUALITY SITES GAS EMISSIONS POLLUTION CHEMICAL...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (3): 349–364.
Published: 01 August 1983
... SUBSOIL BUNDS TRAINING CAUSEWAYS WHARVES RETAINING RECLAMATION LAYOUT MAINTENANCE CONTRACTS DREDGERS SILTING EROSION COSTS Proc. Instn Ciu.Engrs, Part 1, 1983,74,Aug., 349-364 PAPER 8649 Design and constructionof Muara Deep Water PortB, runei A. H. BECKETT, MBE, BSc, FICE* S. MARSHALL, BSc...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1981) 70 (4): 623–650.
Published: 01 November 1981
... operations was critical to thesuccess of the berth development and it was important that asmuch as possible was obtained from reclamation over the river bed. The first stage of the development was for a quay length of 306 m but with provision for increasing this to 606 m at a later stage. The boundaries...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (2): 209–226.
Published: 01 May 1979
... CLEANING SAND PROTECTION STORMS PRODUCTION MARINAS YACHTS PLACING RECLAMATION INFILLED SEA CRANES TURNTABLES DREDGING FILLING ARMOURING DAMAGE BRIGHTON ENGLISH CHANNEL CHANNEL UK h o c . Insrn Ciu. Engrs, Part 1, 1979, 66, May, 209-226 8242 Harbour works at Brighton Marina...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (1): 93–114.
Published: 01 February 1979
... 96 D U B ADI R YD O C KD: E S I G NA N DC O N S T R U C T I O N selected from the reclamation area, tipped by lorry into the flooded caisson cells. Caisson design could be based on a series of conservative assumptions, but an accurate assessment of the settlement characteristics of the fill remained...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1977) 62 (4): 563–583.
Published: 01 November 1977
... an open piled wharf with stone revetment to'the seaward slope of the reclamation, and pro- vision was made to flatten this slope and to extend the piled wharf shorewards if the ground was exceptionally bad. In fact this facing slope was not varied, as it proved more economical to dredge out the bad ground...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1977) 62 (1): 75–88.
Published: 01 February 1977
... BEAMS TOWERS MATERIALS PORTS DEEP TERMINALS TRAFFIC GRAVITY ARCHES UNITS WALLS PILES PRESTRESSED PLANNING RECLAMATION BOMBAY BALLARD PIER INDIA ASIA Proc. Instn Ciu. Engrs, Part 1, 1977, 62, Feb., 75-88 7937 Extension of Ballard Pier, Bombay TheBombay Port Trust has over...

or Create an Account

Close subscription notice
Close access options