Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 26
Keywords: RELIEF
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1991) 90 (3): 643–645.
Published: 01 June 1991
.... Kenn, Fellow (formerly Headof Hydraulics, Imperial College, London) The Authors succinct accountof their long experience with their innovative, efficient, effective and inexpensive maximum-discharge flood-relief structures will be of great interest to all water engineers. 67. The quiet passage...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (6): 1237–1259.
Published: 01 December 1988
... of safety of 1.7 on the assumption of hydrostatic internal uplift pressure of 100% on the upstream face and zero on the downstream face. 7. In addition pressure relief drainage holes were drilled from the gallery near the upstream face of blocks 1W19 at 3.4 m centres to ensure some control over...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (5): 965–988.
Published: 01 October 1988
.... High relieffinish 29. An attractivefeature of prominentretaining wallsis the P1 high relief surf- (Figs 11 and 12) conceived as a random sawn boardfinish in three planes Fig. 10. Retaining walls in Colwyn Bay .- . I 911 ROWLAND, JOHNSON AND WENDES ,. . . ijL Fig. I I . P I concretefinish: contract...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (3): 445–474.
Published: 01 June 1988
...WJ DICKENS; IH BENSTED UK © Thomas Telford and ICE 1988 THAMES WATER WATER SUPPLY SYSTEMS SUPPLY WATER TRUNK DISTRIBUTION POTABLE MAINS RETICULATION SOURCES TREATMENT WORKS URBAN REPLACEMENT AGEING AREAS LONG TERM PLANNING RELIEF RING RINGS PUMPED PUMPS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (2): 337–353.
Published: 01 April 1988
... and analysesof results are described here, togethewr ith the reconstruction work. History of constructionand slipping 3. Bin Brook relief channel was excavated between November 1981 and Feb- ruary 1982. It is bordered on one side 'by the housing estate fence line and on the other by openfarmland. Along...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (4): 1051–1055.
Published: 01 August 1986
...KB KHUSHALANI MITHIANI INDUS PAKISTAN ASIA Proc. Znstn Ciu. Engrs, Part 1, 1986,230, Aug., 1051-1055 TN 464 A novel and economic flood relief scheme for Mithiani settlement K. B. KHUSHALANI, BE* Mithiani,asmalltowninPakistan,wasin 1946 indanger of beingerodedbytheRiver...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 831–840.
Published: 01 August 1985
... UPGRADING CONTRACTS COLLECTORS RELIEF SYSTEMS LIAISON GOVERNMENT ORGANISATIONS MANAGEMENT FUNDING COSTS CONSTRUCTION TENDERING COMMISSIONING CAIRO NILE ABU RAWASH EMBABA ZENEIN EGYPT MIDDLE EAST AFRICA © Thomas Telford and ICE 1985 Proc. Instn Cic. Engrs, Part 1...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (2): 291–326.
Published: 01 April 1985
... it was concluded that post-impounding levels near the outlet must not be allowed to exceed pre-reservoir levels. Variousmeans of preventingseepagewere considered but the most appropriate solution was to install relief wells downstream of the dam to release the additional water. Soon after first filling...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (4): 805–836.
Published: 01 November 1983
...JP MILLMORE; R MCNICOL UK © Thomas Telford and ICE 1983 BABTIE SHAW AND MORTON GEOTECHNICS DAMS INVESTIGATIONS DESIGN CONSTRUCTION PERFORMANCE CHARACTERISTICS FOUNDATIONS GLACIAL TILL EARTH EMBANKMENTS CONTROL UNDERSEEPAGE RELIEF WELLS BLANKETS TESTS CLAYS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (2): 191–224.
Published: 01 May 1983
... RELIEF PROTECTION TRAFFIC TEMPORARY SITES ADMINISTRATION LAYOUT GEOLOGY PILING STRUTS CONCRETE PRESSURE DEWATERING RESTRUTTING REMOVAL CLOSURES PILES SAND CUTTING DIVING AIRLIFTS FORMATION TESTS CHALK THANET SAND THANET PIEZOMETERS SETTLEMENT INDICATORS RIVER THAMES...
Journal Articles
R J BRIDLE, M R BROOME, R W HOLMES, G H VULKAN, D B CHARNOCK, T E H WILLIAMS, D PICKERING, W E GALLAGHER, A N BRANT, J G M WOOD, R CAMERON, C EASTMAN, W R VARLEY, A DICK, J C R LATCHFORD, D W SMITH
Proceedings of the Institution of Civil Engineers (1982) 73 (2): 493–512.
Published: 01 June 1982
... of Transport and the CountyCouncil over the relief road proposals against the hard facts of rate of return on capitalinvestment. At that time this was the onlymeans of justifying Government expenditure on a trunk road, and this victory heralded the current forms of assessment for trunk road schemes...
Journal Articles
Proceedings of the Institution of Civil Engineers (1982) 72 (1): 15–26.
Published: 01 February 1982
...RW SARSBY NOISE SHEETPILING OPERATIONS MOTORWAYS ROADS M67 RELIEF CUTTINGS RETAINING WALLS BRIDGES ABUTMENTS CONSTRUCTION TEMPORARY AREAS POPULATION PILING DROP HAMMERS INSTALLATION SHEET VIBRATIONS PROPERTIES PILES PENETRATION DRIVING DIESEL METHODS SOUND LEVELS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1980) 68 (1): 39–67.
Published: 01 February 1980
... not only to the growth ofcrystals.but to dillerential thermal movements or cycles of hydration and dehydration associated with thexceptional ranges of diurnaolsreasonatlemperatureandmoisture changes? Relief and drainage 14. Relief and drainage profoundly allect the groundwater regime and chem- istry...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (3): 395–406.
Published: 01 August 1979
... STAIRWAYS SUBSTATIONS TICKETS HALLS TICKET HALLS EXTENSIONS INTERCHANGES PASSAGES DRAUGHT RELIEF SETTLEMENT TUNNELLING JUBILEE LINE LONDON BOND STREET ADMIRALTY ARCH GREEN PARK UK Proc. Instn Ciu. Engrs, Part 1, 1979, 66, Aug., 395-406 8250 CONTINUED The Jubilee Line 3...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (2): 227–246.
Published: 01 May 1979
... STEELWORK WORKS THREE SPAN CONTINUOUS MANAGEMENT FINISHING BRIDGES COUNTRIES ERECTION STEEL CENTRE LANES DECKS SITES SIDES PIERS EQUIPMENT TENSION WELDING DESIGN RELIEF PRECAST PLANNING MAIN NAVIGATION DEVELOPING ASSEMBLY BOX TWIN TRAFFIC SURFACING FLOATING TEMPORARY BASES...
Journal Articles
Proceedings of the Institution of Civil Engineers (1977) 63 (1): 49–67.
Published: 01 March 1977
...RHJ SELLIN BRISTOL UNIVERSITY SEWERS POLYMERS FLOW COSTS VARIABLES PATTERNS CONSTRUCTION DATA POLLUTION CAPACITY EXPERIMENTS DISCHARGES RELIEF PERIODS GRADIENTS ESTIMATING COST BENEFIT INJECTION DOSING ADDITIVES CAPACITY REPLACEMENT OVERLOAD RATIOS ESTIMATES...
Journal Articles
Proceedings of the Institution of Civil Engineers (1970) 45 (3): 381–400.
Published: 01 March 1970
... ROCKS CONSTRUCTION GROUND PUMPING SEEPAGE WELLS CLAYS LOADS DRAINS RELIEF VERTICAL DERWENT SUNDERLAND SOUTH SHIELDS NORTHUMBERLAND DURHAM UK 7263 Derwent Dam-design considerations N. J. RUFFLE, BSC, FICE' The Paper describes the design, and subsequent changes during...
Journal Articles
Proceedings of the Institution of Civil Engineers (1967) 37 (3): 557–565.
Published: 01 July 1967
... SUPERELEVATION FLOODS TRAPEZOIDAL FLOW BENDS MODELS RELIEF SHAPE ALPHIN BROOK Discussion on Paper No. 6952* Design of channels for supercritical flow by A. J. M. Harrison, B.Sc., Dip.H.E. (Delft), A.M.I.C.E. Mr A. M. R. Montagu (Sir M. MacDonaId and Partners) considered thatMr Harrison s Paper...
Journal Articles
Proceedings of the Institution of Civil Engineers (1965) 31 (2): 205–207.
Published: 01 June 1965
... estimated a gain of about E150 million per annum in this way.) He did not regard pricing as the alternative t o other methods of relief of cohgestion, in particular road improvements. In his introductory notes Mr Roth gave ten requirements that should be fulfilled by a road pricing system. 1. Charges should...
Journal Articles
Proceedings of the Institution of Civil Engineers (1965) 30 (3): 449–487.
Published: 01 March 1965
... of shallow holes of an average depth of 35 ft was used. Pressure reIief 21. As a precaution against pressure building up in thefoundations down- stream of the dam, 42 relief holes were drilled at 10-ft intervals. They drain into galleries constructed immediately downstream of the spillway channels where V...
