Skip to Main Content
Keywords: SEVERN BRIDGE
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1969) 42 (4): 545–566.
Published: 01 April 1969
...SIR G ROBERTS; KE HYATT; CD CROSTHWAITE; AD HOLLAND; SR SPARKES; SIR H HARDING; RE KNOX; GIB GOWRING; H SHIRLEY SMITH; TJ UPSTONE; PSA BERRIDGE; C SCRUTON; JK ANDERSON; A HARDIE; SIR A PUGSLEY; KNOX 7138,7119 8-t7084 DISCUSSION Severn Bridge SIRGILBERTROBERTS,G. I. B. GOWRING, A. HARDIE & K. E...
Journal Articles
Proceedings of the Institution of Civil Engineers (1968) 41 (1): 49–67.
Published: 01 September 1968
...G I B GOWRING; A HARDIE © Thomas Telford and ICE 1968 MOTT HAY AND ANDERSON FREEMAN FOX JOHN HOWARD AND CO LTD BRIDGES SUBSTRUCTURES SITES TIDES METHODS BOREHOLES CONCRETE SEVERN BRIDGE GEOLOGY DESIGN ESTUARIES TEMPORARY ANCHORAGES COSTS FOUNDATIONS CONDITIONS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1968) 41 (1): 1–48.
Published: 01 September 1968
... OSCILLATIONS SEVERN BRIDGE HOLLOW STIFFENING QUANTITIES SUPERSTRUCTURES DAMPING TOWERS ANCHORAGES EXPANSION SURFACING STANDARDS DECKS WIND DESIGN BOX HANGERS COSTS PIERS ENDS JOINTS PROTECTIVE LOADS CONSORTIA VELOCITY INCLINATION SEVERN UK 713...
Journal Articles
Proceedings of the Institution of Civil Engineers (1968) 41 (1): 69–104.
Published: 01 September 1968
... items were made at Arrol's works beforvshipping them to the site.Some sucessful modifications were made to parts of the spinning gear in the light of experi- ence, but the general operation was unchanged for the second bridge. Fig. 1 70 SEVERN BRIDGE: FABRICATION AND ERECTION lowers Fabrication 4...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1963) 26 (4): 11.
Published: 01 December 1963
...M H DAVIS © Thomas Telford and ICE 1963 SEVERN BRIDGE BRIDGES SUSPENSION UK SEVERN NEWS N11 Severn Bridge Reported by M. H. DAVISA, .M.I.C.E. The new suspension bridge being constructed across the Severnbetween Aust on the east bank and Beachley onthe west bank will carry...
Journal Articles
Proceedings of the Institution of Civil Engineers (1956) 5 (6): 575–611.
Published: 01 November 1956
... that on the proposed Severn bridge. The figures show that theminimum volume of traffic in the first year would be 2,400,000 vehicles and the probable volume about 3,200,000 vehicles. Within 10 years the traffic would be doubled. Furthermore it is estimated that not less than 1,000,OOO gal of petrol and diesel fuel...
Journal Articles

or Create an Account

Close Modal
Close Modal