Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: SWITCHGEARS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
KIAMBERE HYDROELECTRIC PROJECT, KENYA. PART 3: FINANCE AND CONSTRUCTION.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 813–841.
Published: 01 August 1989
... a gross storage of 585 X 106m3; 10 km of tunnel works with a 6.1 m dia. headrace tunnel; an underground powerhouse with an excavated volume of 22000 m3 and a principal span of 20 m; two 72 MW/158 m gross head Francis turbines with associated generators, transformers, switchgear and transmission...
Journal Articles
KIAMBERE HYDROELECTRIC PROJECT, KENYA. PART 2: DESIGN.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 787–812.
Published: 01 August 1989
... of tunnel works with the headrace tunnel at 6.1 m diam., (c) an underground powerhouse with an excavated volume of 22 OOO m3 and a principal span of 20 m; (d)two 72 MW/158 m gross head Francis turbines with associated generators, transformers, switchgear and transmission. This second Paper describes...
Journal Articles
RAILWAY MODERNIZATION CONFERENCE. ELETRIC TRACTION IN THE BRITISH RAILWAYS MODERNIZATION PLAN. JOINT MEETING WITH IMECHE AND IEE ON 3 & 4 MAY 1961
Available to Purchase
Proceedings of the Institution of Civil Engineers (1961) 18 (4): 361–380.
Published: 01 April 1961
... CURRENTS NATIONALISATION ELECTRICITY DIRECT VOLTAGE SUPPLY SUBSTATIONS SWITCHGEARS FEEDERS OVERHEAD UNITS MULTIPLE Paper No. 6518 ELECTRICTRACTION W THE BRITISH RAD..WAYS MODERNIZATION PLAN Stanley Bernard Warder, M.I.Mech.E., M.I.E.E. Chief Electrical Engineer, British Railways Central...
Journal Articles
SWEDISH UNDERGROUND HYDRO-ELECTRIC POWER STATIONS.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1954) 3 (4): 321–344.
Published: 01 July 1954
...J F HAGRUP © Thomas Telford and ICE 1954 SWEDISH STATE POWER BOARD UNDERGROUND HYDROELECTRICITY HYDROELECTRIC POWER STATIONS WATER POWER RESOURCES INTAKES PENSTOCKS DISCHARGES TUNNELS SURGES BASINS TRANSFORMERS SWITCHGEARS DAMS PLANNING PORE PRESSURE BLASTING...
