In this study, recovery factor was considered in the maintenance management model that integrates the quantitative method and qualitative concept. The model is developed to solve the practical parameters in a maintenance management task, such as the number of maintenance personnel and maintenance cycle time. The stochastic model is applied to construct the relationships among maintenance cycle, maintenance personnel allocation, human recovery factor, and a system's tolerance time. In addition, a simulated experiment was conducted to find out the supplementary parameters such as individual latent human error, individual critical human error, recovery rate, and a system's tolerance time. Since system availability is the criterion of this maintenance management model, the final solution of this model provides a system availability reference table of the combination of the number of maintenance personnel and the maintenance cycle time. This system availability reference table is a practical tool for maintenance managers.
Article navigation
1 June 2004
Research Article|
June 01 2004
A stochastic maintenance management model with recovery factor
Cheng‐Hua Wang;
Cheng‐Hua Wang
Lecturer, Department of Business Administration, Chang‐Jung Christian University, Tainan, Taiwan
Search for other works by this author on:
Sheue‐Ling Hwang
Sheue‐Ling Hwang
Professor, Department of Industrial Engineering and Engineering Management, National Tsing‐Hua University, Hsinchu, Taiwan
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7832
Print ISSN: 1355-2511
© Emerald Group Publishing Limited
2004
Journal of Quality in Maintenance Engineering (2004) 10 (2): 154–165.
Citation
Wang C, Hwang S (2004), "A stochastic maintenance management model with recovery factor". Journal of Quality in Maintenance Engineering, Vol. 10 No. 2 pp. 154–165, doi: https://doi.org/10.1108/13552510410539222
Download citation file:
New and popular articles
Suggested Reading
Human error in maintenance: a review
Journal of Quality in Maintenance Engineering (January,2006)
FM – a pragmatic tool to model, analyse and predict complex behaviour of industrial systems
Engineering Computations (June,2007)
Why leaders fail: exploring the darkside
International Journal of Manpower (January,2006)
On the imbalance of the security problem space and its expected consequences
Information Management & Computer Security (October,2007)
Human reliability analyses by random hazard rate approach
COMPEL (March,2004)
Related Chapters
Industrial rope access approach in the inspection and maintenance management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
New developments of the Italian bridge management system
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
A COMPREHENSIVE APPROACH TO LIFE EXTENSION OF WASTEWATER TREATMENT FACILITIES
Repair and Renovation of Concrete Structures: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–6 My 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
