Article navigation
Purpose

The aim of this paper is to present a synthetic chart based on the non‐central chi‐square statistic that is operationally simpler and more effective than the joint and R chart in detecting assignable cause(s). This chart will assist in identifying which (mean or variance) changed due to the occurrence of the assignable causes.

Design/methodology/approach

The approach used is based on the non‐central chi‐square statistic and the steady‐state average run length (ARL) of the developed chart is evaluated using a Markov chain model.

Findings

The proposed chart always detects process disturbances faster than the joint and R charts. The developed chart can monitor the process instead of looking at two charts separately.

Originality/value

The most important advantage of using the proposed chart is that practitioners can monitor the process by looking at only one chart instead of looking at two charts separately.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal