Skip to Main Content
Article navigation

Maintenance managers must often make preventive maintenance (PM) decisions based on limited historical failure data. These small data sets introduce significant uncertainties which can lead to selecting suboptimal (more costly) PM intervals. Examines the performance of two commonly used estimation techniques (MLE and rank regression), and develops a third hybrid technique which improves the PM interval accuracy for small data sets. In addition, characterizes the risks involved in making PM decisions based on small data sets for all three methods, to provide useful guidelines for the practising maintenance engineer.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal