Skip to Main Content
Article navigation
Purpose

The most costly part in an open-pit mine is the transportation of material out of the mine. The efficiency of the truck-and-shovel fleet plays a major role in cost control. The paper aims to discuss these issues.

Design/methodology/approach

The truck dispatching simulation model with consideration of age-based maintenance is proposed.

Findings

This paper underlines an impact of truck dispatching decisions and reveals remarkable differences in the total production under different approaches of operational availability. Additionally, the simulated results introduce an effective scheduled maintenance for different truck age levels.

Originality/value

The approach is based on a case study taking into account the stochastic equipment behavior and environment in a real open-pit mine. This approach can be used more generally in situations in which truck fleets are used to transport material.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal