As the time to dispose of a system approaches, renewal of wearing components becomes progressively less attractive. The traditional optimization method for this situation is through net present value and dynamic programming. Presents a much simpler solution for rapidly‐wearing components founded on finding the optimum number of equal renewal intervals. Unequal intervals increase expected failures for any fixed number of intervals, and it is argued that it is unnecessary to discount costs. The model can be used with either the Cox renewal function or the cumulative hazard function representing the expected number of failures between scheduled renewals of the component, the choice depending on whether the component is minimally repaired or renewed at these failures.
Article navigation
1 June 1997
Research Article|
June 01 1997
A note on block and bad‐as‐old renewal of components with limited system time horizon
David Sherwin
David Sherwin
Department of Industrial Engineering, Lund University Institute of Technology, Lund, Sweden
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7832
Print ISSN: 1355-2511
© MCB UP Limited
1997
Journal of Quality in Maintenance Engineering (1997) 3 (2): 143–147.
Citation
Sherwin D (1997), "A note on block and bad‐as‐old renewal of components with limited system time horizon". Journal of Quality in Maintenance Engineering, Vol. 3 No. 2 pp. 143–147, doi: https://doi.org/10.1108/13552519710167755
Download citation file:
New and popular articles
Suggested Reading
Optimum inspection frequency for manufacturing systems
International Journal of Quality & Reliability Management (May,1998)
System equivalence: the application of joint optimization
Measuring Business Excellence (December,2000)
Renewal in changing environment
Journal of Quality in Maintenance Engineering (September,1998)
An optimal design of joint X‐ and S control charts using quadratic loss function
International Journal of Quality & Reliability Management (December,1997)
Smart sensors for industrial applications
Sensor Review (September,1997)
Related Chapters
Multi-objective optimization in a circumscribed bridge system
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Optimizing Resources to Better Forecast Future Profits
Advances in Business and Management Forecasting
Using process capability analysis and simulation to improve patient flow
Applications of Management Science
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
