Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Break-even point
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Optimal preventive maintenance policy for leased equipment for free with minimum quantity of consumables purchasing commitment by the lessee
Available to Purchase
Journal of Quality in Maintenance Engineering (2023) 29 (3): 708–725.
Published: 03 March 2023
... the corresponding minimum maintenance cost, the minimum quantity of consumables (the lessor's break-even point) to be purchased by the lessee is computed. A numerical example and a sensitivity study are presented, and the obtained results are discussed. Findings The outcome of this work is supposed to help...
Journal Articles
Feasibility of adopting in‐and‐out‐sourcing: A case study of PetroCost for Engineering Investment and Construction Co. Ltd
Available to Purchase
Journal of Quality in Maintenance Engineering (2012) 18 (1): 4–15.
Published: 23 March 2012
...‐sourcing cost, and a break‐even point of 27 days, one third of the recommended project life. Both cases are in favor of having their own trucks while conducting in‐house maintenance. Practical implications The traditional in‐house approach is considered by many firms as the best maintenance strategy...
