Skip to Main Content
Keywords: LOWERING
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Selected Engineering Papers (1933) 1 (144)
Published: 01 January 1933
...S S G TULLOCH © Thomas Telford and ICE 1933 PALESTINE POTASH LTD LAYING SUCTION PIPES EVAPORATION ASSEMBLING LAUNCHING LOWERING FLEXIBLE JOINTS DEAD SEA Cbe 3netftutfon of Engfneere. SELECTED ENGINEERING PAPERS. BEINGORIGINAL COMMUNICATIONSORDERED BY THE COUNCIL...
Journal Articles
Selected Engineering Papers (1929) 1 (67)
Published: 01 January 1929
... close the ends of the Bridgewater canal. The connection between the ends of the aqueduct and the Bridgewater canal is made watertight by means of tapered rubberfaced U-pieces which are moved out of the way before swinging. The aqueduct swings upon the lower turning-path, 27 feetin 111o:m diameter and 32...
Journal Articles
Selected Engineering Papers (1929) 1 (70)
Published: 01 January 1929
... observations on a large artesian boring, covering a period of 25 years, from its sinking in 1901 to its abandonment in 1927. The boring, whichis situated a t Luton, Chatham, and which is the property of the Chatham and DistrictWater Company, was driven to the Lower Greensand by Messrs. C. Isler and Company...

or Create an Account

Close Modal
Close Modal