Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: MASONRY
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
CONSTRUCTION OF A REGULATOR AND LOCK AT KAFR BULIN. (INCLUDES PLATES AND APPENDIX).
Available to Purchase
Journal:
Selected Engineering Papers
Selected Engineering Papers (1931) 1 (104)
Published: 01 January 1931
... important masonry work of the canalization system of Behera. It replaces an obsolete regulator which was built in 1825 of indifferent materials, and which had been condemned as unsafe. A 12-metre lockwas combined with the regulator, so as to open upthe canal to navigationasfar asthe railway-line a t kilo...
Journal Articles
SCARBOROUGH VALLEY BRIDGE RECONSTRUCTION. (INCLUDES PLATES).
Available to Purchase
Journal:
Selected Engineering Papers
Selected Engineering Papers (1929) 1 (76)
Published: 01 January 1929
... antdhuensatisfactorsytate of , -~ ~ - 1 Original Communication No. 4 4 GWYTHER ON SCARBOROUGH VALLEYBRIDGE RECONSTRUCTION. the masonry abutmentsand approaches.Thenorthern abutment was 5 inches out of plumb ; the first archway on the north side had beenstrengthenedby the construction of five 4-footbrick malls beneath...
Journal Articles
THE RECONSTRUCTION OF THE ENGLISH BRIDGE OVER THE RIVER SEVERN AT SHREWSBURY. (INCLUDES PLATES.)
Available to Purchase
Journal:
Selected Engineering Papers
Selected Engineering Papers (1928) 1 (66)
Published: 01 January 1928
... to the middle one. The whole of the dressed stone had been quarried a t Grinshill, 8 miles north of Shrewsbury. OVER THE RIVER SEVERN AT SHREWSBURY. 7 The internal masonry in the haunches and linings of spandrel walls was well-built rubble and of ample proportions. The spandrel linings were 4 feet thick...
Journal Articles
THE PHILOSOPHY OF MASONRY ARCHES.
Available to Purchase
Journal:
Selected Engineering Papers
Selected Engineering Papers (1927) 1 (56)
Published: 01 January 1927
...SIR E O WILLIAMS © Thomas Telford and ICE 1927 MASONRY ARCHES THEORY STRESS THICKNESS INVESTIGATIONS TEMPERATURE LIVE LOADS ABUTMENTS RISE RATIOS CURVES PLAIN REINFORCED CONCRETE STEEL WIDTH OPEN ECONOMICS FILLED QUALITY FOUNDATIONS CALCULATIONS...
