Article navigation

Beams & girders

Design procedures for combined shear and patch loading of plate girders. Roberts T.M. and Shahabian F. Aug., 219–225

Designing composite steel beams with precast concrete hollow-core slabs. Lam D., Elliott K.S. and Nethercot D.A. May, 139–149

Experiments on composite steel beams with precast concrete hollow core floor slabs. Lam D., Elliott K.S. and Nethercot D.A. May, 127–138

Non-planar beam–wall joints in tall building structures. Kwan A.K.H. and Chan W.T. Feb., 73–83

Shear peeling of steel plates adhesively bonded to the sides of reinforced concrete beams. Mohamed Ali M.S., Oehlers D.J. and Bradford M.A. Aug., 249–259

Strengthening reinforced concrete girders with ‘n’ and ‘T’ cross-sections. Haldane D. and Ziara M.M. Feb., 61–72

Web buckling of tapered plate girders. Mirambell E. and Zárate A.V. Feb., 51–60

Bridges

An energy approach for geometrically non-linear analysis of cable-stayed bridges. Xi Y. and Kuang J.S. Aug., 227–237

Continuous precast concrete girder and slab bridge decks. Marí A.R. and Montaner J. Aug., 195–206

Membrane action in plain concrete slabs under concentrated loading. Eyre J.R. Aug., 207–217

Partially and non-destructive testing of 40 concrete bridges. Tajalli S.M.A. and Rigden S.R. Feb., 25–38

Peeling failure of reinforced concrete beams with fibre-reinforced plastic or steel plates glued to their soffits. Raoof M. and Hassanen M.A.H. Aug., 291–305

The behaviour of shear connections in a composite beam with a full-depth precast slab. Shim C.S., Kim J.H., Chang S.P. and Chung C.H. Feb., 101–110

Thermal behaviour of composite box-girder bridges. Chang S.P. and Im C.K. May, 117–126

Buildings, structure & design

Experiments on composite steel beams with precast concrete hollow core floor slabs. Lam D., Elliott K.S. and Nethercot D.A. May, 127–138

Stress analysis of buildings under horizontal load. Part 1: Basic behaviour—deformations. Zalka K.A. May, 179–186

Stress analysis of buildings under horizontal load. Part 2: Load distribution. Zalka K.A. Aug., 261–275

The new No. 1 court and Broadcast Centre: All England Lawn Tennis and Croquet Club, Wimbledon. Pike D. Nov., 339–344

The Reebok Stadium. Douglas S.P. Nov., 333–338

The response of grandstands to dynamic crowd loads. Ellis B.R., Ji T. and Littler J.D. Nov., 355–365

Wall panel renaissance: tilt-up concrete construction. Glass J. Aug., 277–289

Cables & tendons

An energy approach for geometrically non-linear analysis of cable-stayed bridges. Xi Y. and Kuang J.S. Aug., 227–237

Codes of practice & standards

Design procedures for combined shear and patch loading of plate girders. Roberts T.M. and Shahabian F. Aug., 219–225

Welded aluminium alloy connections: a simplified plastic model. Chan T.K. and Porter Goff R.F.D. May, 161–168

Columns

Effective lengths of concrete-filled steel square hollow sections in fire. Bailey C. May, 169–178

Composite structures

Designing composite steel beams with precast concrete hollow-core slabs. Lam D., Elliott K.S. and Nethercot D.A. May, 139–149

Effective lengths of concrete-filled steel square hollow sections in fire. Bailey C. May, 169–178

Experiments on composite steel beams with precast concrete hollow core floor slabs. Lam D., Elliott K.S. and Nethercot D.A. May, 127–138

Concrete structures

A proposed empirical corrosion model for reinforced concrete. Roberts M.B., Atkins C., Hogg V. and Middleton C. Feb., 1–11

A refined strut–tie model approach and its application tool. Yun Y.M. Feb., 13–24

Continuous precast concrete girder and slab bridge decks. Marí A.R. and Montaner J. Aug., 195–206

Control of reinforcement corrosion by surface treatment of concrete. Sergi G., Seneviratne A.M.G., Maleki M.T., Sadegzadeh M. and Page C.L. Feb., 85–100

Croke Park redevelopment—stadium design in an urban context. Murray F.V. Nov., 345–353

Membrane action in plain concrete slabs under concentrated loading. Eyre J.R. Aug., 207–217

Partially and non-destructive testing of 40 concrete bridges. Tajalli S.M.A. and Rigden S.R. Feb., 25–38

Peeling failure of reinforced concrete beams with fibre-reinforced plastic or steel plates glued to their soffits. Raoof M. and Hassanen M.A.H. Aug., 291–305

Reliability assessment of deteriorating reinforced concrete beams. Sarveswaran V., Roberts M.B. and Ward J.A. Aug., 239–247

Shear peeling of steel plates adhesively bonded to the sides of reinforced concrete beams. Mohamed Ali M.S., Oehlers D.J. and Bradford M.A. Aug., 249–259

Stadium Australia: for 2000 Olympics. Morley S., King A. and Ashfield M. Nov., 307–314

Strengthening reinforced concrete girders with ‘n’ and ‘T’ cross-sections. Haldane D. and Ziara M.M. Feb., 61–72

The Amsterdam Arena: a multi-functional stadium. Mans I.D.G. and Rodenburg J. Nov., 323–331

Wall panel renaissance: tilt-up concrete construction. Glass J. Aug., 277–289

Corrosion

A proposed empirical corrosion model for reinforced concrete. Roberts M.B., Atkins C., Hogg V. and Middleton C. Feb., 1–11

Control of reinforcement corrosion by surface treatment of concrete. Sergi G., Seneviratne A.M.G., Maleki M.T., Sadegzadeh M. and Page C.L. Feb., 85–100

Reliability assessment of deteriorating reinforced concrete beams. Sarveswaran V., Roberts M.B. and Ward J.A. Aug., 239–247

Design methods & aids

A refined strut–tie model approach and its application tool. Yun Y.M. Feb., 13–24

Stress analysis of buildings under horizontal load. Part 1: Basic behaviour—deformations. Zalka K.A. May, 179–186

Stress analysis of buildings under horizontal load. Part 2: Load distribution. Zalka K.A. Aug., 261–275

Dynamics

Wind effects on a very tall building and wavelet analysis. Fang J.Q., Li Q.S., Jeary A.P. and Wong C.K. May, 151–159

Environment

Thermal behaviour of composite box-girder bridges. Chang S.P. and Im C.K. May, 117–126

Fatigue

The behaviour of shear connections in a composite beam with a full-depth precast slab. Shim C.S., Kim J.H., Chang S.P. and Chung C.H. Feb., 101–110

Field testing & monitoring

Partially and non-destructive testing of 40 concrete bridges. Tajalli S.M.A. and Rigden S.R. Feb., 25–38

Maintenance & inspection

Partially and non-destructive testing of 40 concrete bridges. Tajalli S.M.A. and Rigden S.R. Feb., 25–38

Peeling failure of reinforced concrete beams with fibre-reinforced plastic or steel plates glued to their soffits. Raoof M. and Hassanen M.A.H. Aug., 291–305

Materials technology

A proposed empirical corrosion model for reinforced concrete. Roberts M.B., Atkins C., Hogg V. and Middleton C. Feb., 1–11

Mathematical modelling

Welded aluminium alloy connections: a simplified plastic model. Chan T.K. and Porter Goff R.F.D. May, 161–168

Recreational facilities

Croke Park redevelopment—stadium design in an urban context. Murray F.V. Nov., 345–353

The Reebok Stadium. Douglas S.P. Nov., 333–338

The response of grandstands to dynamic crowd loads. Ellis B.R., Ji T. and Littler J.D. Nov., 355–365

Rehabilitation, reclamation & renovation

Shear peeling of steel plates adhesively bonded to the sides of reinforced concrete beams. Mohamed Ali M.S., Oehlers D.J. and Bradford M.A. Aug., 249–259

Strengthening reinforced concrete girders with ‘n’ and ‘T’ cross-sections. Haldane D. and Ziara M.M. Feb., 61–72

Research & development

Continuous precast concrete girder and slab bridge decks. Marí A.R. and Montaner J. Aug., 195–206

Wall panel renaissance: tilt-up concrete construction. Glass J. Aug., 277–289

Risk & probability analysis

Reliability assessment of deteriorating reinforced concrete beams. Sarveswaran V., Roberts M.B. and Ward J.A. Aug., 239–247

Slabs & plates

Designing composite steel beams with precast concrete hollow-core slabs. Lam D., Elliott K.S. and Nethercot D.A. May, 139–149

Membrane action in plain concrete slabs under concentrated loading. Eyre J.R. Aug., 207–217

The Amsterdam Arena: a multi-functional stadium. Mans I.D.G. and Rodenburg J. Nov., 323–331

Statistical analysis

Wind effects on a very tall building and wavelet analysis. Fang J.Q., Li Q.S., Jeary A.P. and Wong C.K. May, 151–159

Steel structures

Croke Park redevelopment—stadium design in an urban context. Murray F.V. Nov., 345–353

Design procedures for combined shear and patch loading of plate girders. Roberts T.M. and Shahabian F. Aug., 219–225

Manchester United FC new North Stand. Gannon P. Nov., 315–322

Stadium Australia: for 2000 Olympics. Morley S., King A. and Ashfield M. Nov., 307–314

The Amsterdam Arena: a multi-functional stadium. Mans I.D.G. and Rodenburg J. Nov., 323–331

The new No. 1 court and Broadcast Centre: All England Lawn Tennis and Croquet Club, Wimbledon. Pike D. Nov., 339–344

The Reebok Stadium. Douglas S.P. Nov., 333–338

Web buckling of tapered plate girders. Mirambell E. and Zárate A.V. Feb., 51–60

Strength & testing of materials

Masonry crack damage: its origins, diagnosis, philosophy and a basis for repair. Cook D.A., Ledbetter S., Ring S. and Wenzel F. Feb., 39–50

The behaviour of shear connections in a composite beam with a full-depth precast slab. Shim C.S., Kim J.H., Chang S.P. and Chung C.H. Feb., 101–110

Welded aluminium alloy connections: a simplified plastic model. Chan T.K. and Porter Goff R.F.D. May, 161–168

Stress analysis

Stress analysis of buildings under horizontal load. Part 1: Basic behaviour—deformations. Zalka K.A. May, 179–186

Stress analysis of buildings under horizontal load. Part 2: Load distribution. Zalka K.A. Aug., 261–275

Structural frameworks

Manchester United FC new North Stand. Gannon P. Nov., 315–322

The new No. 1 court and Broadcast Centre: All England Lawn Tennis and Croquet Club, Wimbledon. Pike D. Nov., 339–344

Subsidence

Masonry crack damage: its origins, diagnosis, philosophy and a basis for repair. Cook D.A., Ledbetter S., Ring S. and Wenzel F. Feb., 39–50

Thermal effects

Effective lengths of concrete-filled steel square hollow sections in fire. Bailey C. May, 169–178

Thermal behaviour of composite box-girder bridges. Chang S.P. and Im C.K. May, 117–126

Wind loading & aerodynamics

Manchester United FC new North Stand. Gannon P. Nov., 315–322

Wind effects on a very tall building and wavelet analysis. Fang J.Q., Li Q.S., Jeary A.P. and Wong C.K. May, 151–159