Extensive measurements were taken of the forces in the props supporting the formwork and in the backprops below the most recently cast floors during construction of a seven-storey flat slab structure at the Building Research Establishment, Cardington as part of the European Concrete Building Project. Comparison with backprop forces calculated by conventional means using the commonly adopted assumptions for backprop behaviour shows that backprop forces are significantly overestimated. This implies that the uppermost floor slab which supports the formwork and falsework for casting the next slab may be considerably more heavily loaded in practice than is normally assumed. A theoretical study showed that the errors in the calculations were due to ignoring the finite stiffness of the backprops and to ignoring the layout of the backprops relative to the layout of the props supporting the formwork. Improved calculation methods are proposed which make allowance for these factors.
Article navigation
August 2001
Research Article|
August 01 2001
The forces in backprops during construction of flat slab structures
A. W. Beeby
A. W. Beeby
Professor of Structural Design
School of Civil Engineering, University of Leeds
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
January 02 2000
Accepted:
September 15 2000
Online ISSN: 1751-7702
Print ISSN: 0965-0911
© 2001 Thomas Telford Ltd
2001
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2001) 146 (3): 307–317.
Article history
Received:
January 02 2000
Accepted:
September 15 2000
Citation
Beeby AW (2001), "The forces in backprops during construction of flat slab structures". Proceedings of the Institution of Civil Engineers - Structures and Buildings, Vol. 146 No. 3 pp. 307–317, doi: https://doi.org/10.1680/stbu.2001.146.3.307
Download citation file:
New and popular articles
Suggested Reading
Queensferry Crossing, UK: towers, piers and abutments – design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (July,2018)
Lifting a 183 t concrete digester roof safely and cost-effectively with hydraulic bottle jacks
Proceedings of the Institution of Civil Engineers - Civil Engineering (January,2023)
Design challenges resulting from construction of the River Dee Bridge, Aberdeen, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (October,2021)
A1 River Tyne bridge, UK—design and construction
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2005)
Transforming delivery of Water Street Bridge abutment in London, UK through innovation
Proceedings of the Institution of Civil Engineers - Civil Engineering (October,2019)
Related Chapters
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.