The mechanical properties of cooperative system bridges are complex. This paper describes the construction monitoring and load tests of a cable-stayed and arch cooperative bridge. The cable force, girder stress and arch alignment were monitored during construction to ensure the safety of the bridge structure and attain the intended internal force state in the completed bridge. Static and dynamic load tests were performed after completing the bridge to test its bearing capacity. The construction monitoring observations indicated that the cable force and suspender force change of the bridge during construction were generally consistent with theoretical calculations. The measured cable force of cable C01 was between 2155 and 3085 kN, and the measured value of suspender LS15 was between 980 and 1250 kN; these values conform to the laws of mechanics. The load test results demonstrated that the maximum deflection of the mid-span section of the girder was 5.8 mm, which was less than the theoretical value (6.3 mm). The measured impact coefficients of the bridge under four sets of working conditions based on dynamic load testing were similar to the computed results. These results confirm that the girder has sufficient structural stiffness.
Article navigation
May 2024
Research Article|
December 20 2022
Construction verification of a cable-stayed arch cooperative bridge in China
Kexin Zhang, PhD
;
Kexin Zhang, PhD
Associate Professor, School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, P. R. China
Search for other works by this author on:
Dachao Li, BEng;
Dachao Li, BEng
Postgraduate student, School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, P. R. China
Search for other works by this author on:
He Liu, PhD;
He Liu, PhD
Lecturer, School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, P. R. China (corresponding author: heliu@sjzu.edu.cn)
Search for other works by this author on:
Xingwei Xue, PhD
;
Xingwei Xue, PhD
Professor, School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, P. R. China
Search for other works by this author on:
Fei Teng, PhD
Fei Teng, PhD
Lecturer, School of Transportation and Geomatics Engineering, Shenyang Jianzhu University, Shenyang, Liaoning, P. R. China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
February 23 2022
Accepted:
November 03 2022
Online ISSN: 1751-7702
Print ISSN: 0965-0911
Emerald Publishing Limited: All rights reserved
2022
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2024) 177 (5): 371–384.
Article history
Received:
February 23 2022
Accepted:
November 03 2022
Citation
Zhang K, Li D, Liu H, Xue X, Teng F (2024), "Construction verification of a cable-stayed arch cooperative bridge in China". Proceedings of the Institution of Civil Engineers - Structures and Buildings, Vol. 177 No. 5 pp. 371–384, doi: https://doi.org/10.1680/jstbu.22.00029
Download citation file:
New and popular articles
Suggested Reading
An integral composite bridge of high skew
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2003)
Briefing: Innovative design of semi-integral bridges on the new A428
Proceedings of the Institution of Civil Engineers - Bridge Engineering (December,2008)
Analyses of a composite bowstring truss with tension stiffening
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2003)
Application of bolted connections in fibre-reinforced polymers
Proceedings of the Institution of Civil Engineers - Structures and Buildings (October,2011)
Impact of shear connectors on the behaviours of box-girders with corrugated webs
Proceedings of the Institution of Civil Engineers - Structures and Buildings (October,2017)
Related Chapters
USE OF COMPOSITE STRUCTURES IN A BUILDING ABOVE A METRO STATION
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
UK Implementation of Eurocodes for Bridge Design – An Overview
Bridge Design to Eurocodes: UK Implementation
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.