Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-5 of 5
Keywords: FIXED
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
NOSE OPTIMIZATION IN LAUNCHED BRIDGES.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Structures and Buildings (1999) 134 (4): 373–375.
Published: 01 November 1999
...M ROSIGNOLI © Thomas Telford and ICE 1999 BRIDGES LAUNCHED OPTIMISATION NOSES LAUNCHING DESIGN STRESS TEMPORARY MOVEMENT FIXED BEARINGS COSTS CONTROL DECKS INTERACTION METHODS MODELLING MATHEMATICAL MODELS PRECAST CONCRETE MOMENTS FORCES EXTENSIONS ELASTIC SYSTEMS...
Journal Articles
DETERMINATION OF RESTRAINT FORCES FOR STEEL STRUTS.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Structures and Buildings (1998) 128 (3): 282–289.
Published: 01 August 1998
... of the restraint. Case 2: Fixed xed strut 17. Equation (7) is applied with the relevant expressions for the bending moment as follows: M1 from equation (2) with z0 from equation (13) M2 from equation (11) and M3 from equation (5). B ¹ p2M u2 0 ¼ 0·5 ¹ 2ðu2 u2 ¹ 4p2Þ and A sin u þ B cos u ¹ p2 M 0 u2 ¹ p2R0 u2 u2...
Journal Articles
SOLUTION OF THE CONTINUOUS BEAM IN LAUNCHED BRIDGES.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Structures and Buildings (1997) 122 (4): 390–398.
Published: 01 November 1997
... above fixed bearings should require the examination of an infinite number of static schemes, since the front part of the deck overhangs beyond the first pier to reach the following one, and the progressive growth of the negative moment in the front support section propagates backwards in the continuous...
Journal Articles
INFLUENCES OF THE INCREMENTAL LAUNCHING CONSTRUCTION METHOD ON THE SIZING OF PRESTRESSED CONCRETE BRIDGE DECKS.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Structures and Buildings (1997) 122 (3): 316–325.
Published: 01 August 1997
... concrete bridge deck in a fixed formwork placed behind an abutment with incremental launching of the deck as it is gradually built a process at first sight comparable to a cadenced extrusion is a ver y competitive technique for a wide range of deck spans and sizes. During launching, the movement...
Journal Articles
STRESS CONCENTRATIONS OF K TUBULAR JOINTS SUBJECTED TO BASIC AND COMBINED LOADINGS.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Structures and Buildings (1996) 116 (1): 19–28.
Published: 01 February 1996
... SUPERPOSITION FATIGUE LIFE OFFSHORE PLATFORMS FIXED STRAIN GAUGING MODELLING MODELS HOT SPOTS K TUBULAR TOINTS of Energy Guidance Notes." Rosette gauges were placed in pairs around thewhole brace- /chord intersection, oneon the brace and the other on the chord.However, the two brace- /chord...
