Keywords: temporary works
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2023) 176 (3): 236–241.
Published: 22 January 2021
... Publishing: All rights reserved 2021 buildings, structures & design concrete structures temporary works The construction of reinforced concrete (RC) building structures and the different processes used to construct them have been widely studied since the mid-twentieth century (Buitrago...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2018) 171 (9): 719–734.
Published: 02 May 2018
... & testing of materials temporary works This paper concerns the experimental investigation of joints of bridge falsework structures using the Cuplok system. Figure 1 illustrates an example of bridge falsework Cuplok systems. Although this work is included in a project about bridge falsework...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2019) 172 (3): 170–188.
Published: 09 March 2018
... & hazards steel structures temporary works This paper concerns bridge falsework structures commonly used for the construction, rehabilitation and retrofit of bridges. This study considers the Cuplok system (Figure 1) as a demonstrative case study, but the results presented apply to all compatible...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2018) 171 (5): 409–424.
Published: 11 September 2017
... are then compared with those recommended at the site and possible avenues for improvement are explored. concrete technology & manufacture concrete structures temporary works The construction of multi-storey reinforced concrete buildings is highly prevalent in many countries, especially...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2016) 169 (4): 290–297.
Published: 09 December 2015
... in a controlled manner. This paper details the design and implementation phases of this project. buildings, structures & design demolition temporary works In October 2012, Graham Construction was invited to tender for a build-only refurbishment contract for the University of Manchester, where...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2014) 167 (12): 728–742.
Published: 01 December 2014
... the previous borehole information to determine allowable bearing capacity for the raft and soil parameters for any piling associated with the temporary works. London Underground was able to permit a borehole being drilled to depth between the existing tunnels as the separation between the tunnels...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2009) 162 (6): 391–403.
Published: 01 December 2009
... to be pilot tests. However, the agreement between the University and the NASC meant that these connectors also had to be tested and the results reported. 02 4 2009 26 2 2008 © 2009 Thomas Telford Ltd 2009 steel structures temporary works codes of practice & standards...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2008) 161 (2): 57–64.
Published: 01 April 2008
... of the terminal building. The abutments themselves involved 350 t of permanent steelwork which had to be fully erected, piece-small, 22 times. Twin pairs of temporary works, supporting the abutments, each weighing some 1200 t, had to be moved and used as erection aids six times along each edge of the building...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2007) 160 (4): 221–229.
Published: 01 August 2007
...) and built by the contractor FCC Construcción. The car park has a capacity for 300 cars and 30 motorbikes. 28 02 2006 14 06 2007 © 2007 Thomas Telford Ltd 2007 field testing & monitoring mathematical modelling temporary works The car park (Figs 1 and 2) is rectangular...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2001) 146 (3): 307–317.
Published: 01 August 2001
... and any construction loads. Props are adjustable vertical supports which may be used as part of the falsework or as backprops or as reprops. concrete structures slabs & plates temporary works 02 01 2000 15 09 2000 © 2001 Thomas Telford Ltd 2001 Table 1...
Journal Articles
Proceedings of the Institution of Civil Engineers - Structures and Buildings (2001) 146 (1): 85–91.
Published: 01 February 2001
... methods used to form the innovative 54 000 m2 monolithic deck from 1030 precast segmental units giving a 1750 m long continuous structure. 28 10 1999 27 10 2000 © 2001 Thomas Telford Ltd 2001 bridges concrete structures temporary works In 1994, Robert Benaim...

or Create an Account

Close subscription notice
Close access options