Purpose

The use of technological innovations to effectively deliver construction projects is gaining significant coverage. This study aims to assess the inhibiting factors to the utilisation of laser scanners for the delivery of construction projects in developing economies using South Africa as the study area.

Design/methodology/approach

Adopting a quantitative technique, this study elicited responses from construction professionals using a questionnaire as the instrument for data collection. A four-pronged data analysis method was used, comprising descriptive statistics, Kruskal−Wallis h-test, exploratory factor analysis (EFA) and confirmatory factor analysis (CFA).

Findings

Findings from the study show that lack of awareness and high cost of acquisition are the barriers rated by the study’s respondents the most. Also, findings from the EFA and CFA conducted showed and affirmed the significance of three constructs inhibiting factors to the utilisation of laser scanners for construction project delivery: technical hindrances, financial impediments and institutional challenges.

Practical implications

This study makes practical contributions to the discourse of using innovative technologies for effective construction project delivery by inhibiting factors to the use of laser scanners.

Originality/value

Evidence from the literature shows that no study has assessed the barriers to the utilisation of laser scanning technology for construction projects in the South African construction industry. This study strives to close this gap in the literature.

The construction industry is saddled with the responsibility of the production of building and civil structures in the various sectors of the economy of any nation, such as property, transportation, manufacturing and energy (Berk and Bicen, 2018; Rachid et al., 2019; Shang et al., 2020). The industry plays a vital role in determining the degree to which efforts in investment in a resource-rich country are transformed into investment results (Jarkas, 2015; Manoharan et al., 2020; Windapo and Cattell, 2013). The importance of the construction industry extends to its contribution to the socio-economic well-being of any nation. According to Mulder (2013), the industry makes provisions for employment for various categories of skilled and unskilled members of society while also contributing directly to improving the quality of life of the end-users. However, the numerous advantages and contributions of the construction industry are impeded by the prevailing challenges encountered in the delivery of construction projects. The challenges confronting the delivery of construction projects include poor-quality delivery, health and safety issues, schedule overrun, underperforming projects and cost overrun (Ikuabe and Oke, 2019; Ikuabe et al., 2020a; Mustapha et al., 2016; Sultan and Kajewski, 2013). It is therefore advocated that techniques and approaches that can aid in abating some of the challenges confronting the construction industry should be adopted. On this note, the uptake of technological innovations is highly encouraged.

The uptake of digital technologies for construction activities and processes has been touted to bring solace by providing solutions to problems attributed to construction project delivery (Aghimien et al., 2022; Ikuabe et al., 2020b). Laser scanners are an innovative technology that rescues construction processes from inefficiencies and ineffectiveness. Utica et al. (2017) noted that laser scanning technology enables remote detection of the morphology of a building or object through laser beams that strike the surface of the object to be detected, leaving a point as the trace. Furthermore, laser scanning is a technique of high-accuracy mapping or reality capture that uses laser beams to capture details of a section of a building project (Tang et al., 2022). This is actualised through the acquisition of data in the form of point clouds projected in shapes and dimensions of objects in real space converted and represented as a collection of points in 3D digital space (Abdul Shukor et al., 2015; Akanmu et al., 2014; Sepasgozar et al., 2014). In essence, the technology is used to specify parameters of buildings and building objects attributed to very complex shapes (Pawłowicz et al., 2018). Also, laser scanning technology is used for construction project progress monitoring and dimensional compliance control (Maleek et al., 2018). Hence, this enables the conformance of critical dimensional quality control of construction works, which ultimately leads to the risk reduction of late-identified errors.

Using laser scanner technology reduces the labour requirement for site layout for construction projects. Benli (2015) affirmed that using laser scanners for construction operations achieves a 50% reduction in the labour requirement. Also, a reduction in construction time is encountered when laser scanning technology is adopted for construction projects, resulting from the reduced personnel needed Utica et al. (2017). Deploying laser scanners for construction activities abates some inherent risks associated with project delivery (Shanbari et al., 2016). This is attained by circumventing some prevailing risks attributed to human personnel task delivery. Benli (2015) outlined that quick data acquisition from laser scanning technology hinders personnel’s exposure to harmful environments through time reduction. Early detection of defects in construction projects is also enhanced with laser scanning technology (Utica et al., 2017). Hence, this significantly reduces or eliminates the need for reworks associated with construction projects. This is actualised by capturing the state of the building structure in situ with 3D point clouds. Premised on the aforementioned benefits of the technology, this study develops the research questions (RQs):

RQ1.

What are the hindrances to using laser scanning technology for construction project delivery?

RQ2.

What are the possible measures for driving the use of laser scanning technology for construction project delivery?

The study aims to identify and evaluate the drawbacks of implementing laser scanning technology for construction project delivery using a second-order multivariate statistics technique.

The delivery of construction projects in most developing countries is riddled with numerous challenges that can be overcome using laser scanning technology. Furthermore, with the outlined benefits associated with the espousal of laser scanners for construction project delivery, it is imperative to evaluate the barriers to the uptake of the technology for construction project delivery. The study’s findings would provide a roadmap for relevant stakeholders in the construction industry, as well as the steps and actions needed to propel technology adoption. The study contributes significantly to the body of knowledge on the drive for inculcating innovative technologies in construction project execution. The other sections of this paper comprise a review of the extant literature on laser scanners for construction projects, methodology for the study, findings emanating from the study, discussion of findings, conclusion and recommendations.

The complexity of the construction of buildings and civil structures makes it pertinent to use reliable, fast and accurate monitoring systems for the conformance of safety during project execution and the subsequent maintenance of the infrastructure (Gonzalez-Jorge et al., 2012; Nguyen et al., 2020). According to Shanbari et al. (2016), two operating principles guide the use of laser scanners: phase shift laser pulse and time of flight. The phase shift pulse principle conveys a laser beam whose modulation is engaged by harmonic waves. The return of the modulating beam to the device, in conjunction with phase difference, determines the distance calculation through the difference in transmitted and received waves. While the time of flight laser principles calculates the coordinates in 3D space in the environment based on the time taken for a reflection to be received. Laser scanning technologies enable remote detection of the morphology of a building or object through laser beams that strike the surface of the object to be detected, leaving a point as the trace (Aryan et al., 2021; Meadati et al., 2013; Utica et al., 2017).

Laser scanners are quickly gaining acceptance as a tool for 3D modelling and analysis in the construction industry (Huber et al., 2010; Wu et al., 2021). According to Tkac et al. (2018), laser scanning is a technique of reality capture or high-accuracy mapping using laser beams to speedily capture specifics of a certain section of a building project. Also, Szafranko and Pawlowicz (2017) note that data are acquired from points of clouds, which are dimensions of objects and shapes by laser scanners in real space, and subsequently converted and embodied as an assemblage of points in 3D digital space. The working principle of a laser scanner is the measurement of angles and distances between the scanned object and the device with the use of a laser beam whose reflection on the object is transmitted back to the instrument (Pawłowicz et al., 2018; Ustinovichius et al., 2018). The sensors are appropriately suited for capturing the geometry of infrastructure, process plants and the exterior and interior of buildings. The conventional approaches for the capture of as-built information (e.g. theodolite and measurement tape) are progressively being replaced with innovative technologies for data capture, such as laser scanners and digital cameras (Dinis et al., 2020; Liu et al., 2012; Sepasgozara et al., 2015). The range of capabilities of laser scanners means that they can be used in various industries, such as medicine, manufacturing, architecture and engineering, just to mention a few. In building construction, Pawłowicz et al. (2018) note that they can be engaged in building parameter specification and characterisation of building objects attributed to complex shapes and designs. According to Gleason et al. (2013), scanners are deployed for the projection of high-density beams in pursuit of the exact measurement of an object at the highest level. The beams are projected from the device while the measurement is engaged in phase shifts or time of flight on its return to the source. The return time of the laser is measured by the hardware on whose assessment the distance of the physical object is ascertained in relation to the scanner. Current laser scanning technologies can send out thousands of beams per second, resulting in a point cloud of data (Liu et al., 2012; Murtiyoso and Grussenmeyer, 2018).

In the construction industry, it is prevalent that building elements do not come out exactly as specified in design as a result of changes during the life span of the project or errors in construction. Laser scanners are essential in dimensional compliance control and construction project progress monitoring. Maleek, et al. (2018) noted that laser scanners permit decision-makers in enabling the identification of incongruities between the planned and as-built status of a project. Also, Bosche (2012) stated that contractors use laser scanners for enabling the delivery of critical dimensional quality control rapidly, comprehensively and accurately. Hence, leads to a reduction of the risk of late-identified errors that can be very costly to rectify. Furthermore, laser scanners improve the quality of the delivered facilities and enable contractors to subsequently accurately plan and design maintenance operations and future expansion of the infrastructure (Bosche, 2012; Göçer et al., 2016; Lachat et al., 2017). In current practices, the use of laser scanners has rapidly increased in various engineering fields within the built environment in applications such as damage detection, quality assurance, damage documentation and deformation monitoring (Brilakis et al., 2010; Torok et al., 2013; Guldur and Hajjar, 2014).

Recognising the importance of adopting innovative and digital technologies in the delivery of construction projects, the hindering factors to the espousal of these technologies must be evaluated. For laser scanners, considering that the technology is quite a new concept in developing countries, peculiar hindering factors would be associated with its espousal (Uotila et al., 2021). The resistance to change by stakeholders saddled with construction project delivery hinders the technology uptake. Royal Institution of Chartered Surveyors (RICS) (2018) stated that a key aspect of the human element pushing back the espousal of innovative technologies is the opposition to change by stakeholders. Since stakeholders are accustomed to traditional approaches to construction project execution, resistance is exhibited towards alternative approaches and techniques. Also, the cost of digital technologies has been portrayed as a significant barrier to their espousal for construction projects. Leite et al. (2016) opined that costs of purchase, operations and maintenance deter inculcating digital technologies for construction projects. Moreover, the fear of a long payback period resulting from investing in digital technologies can be a barrier to committing funds to propagate its purchase (Utica et al., 2017). It is worthy enough to commit resources to the investment in digitalisation due to the long-term benefits. However, these accrued benefits are not usually expressed concerning financial proceeds but dwell on the social and environmental advantages of the technology. Furthermore, due to the large data generated from the application of laser scanning technology in construction delivery and management, there is a need to use computing systems with high power and capacity. Shanbari et al. (2016) stated that hardware and software with high-end computing capacities must handle and process large data sizes generated. This might serve as a stumbling block towards the espousal of technology. Likewise, laser scanners are susceptible to harsh environmental conditions such as humidity, rainfall and sunshine since it is mostly used outdoors.

Using innovative technologies like laser scanners requires certain knowledge and skills. However, due to the low technical competency of construction personnel and workers in handling emerging technologies, there is an urgent need to acquire skills, training and development. The lack of the requisite skills and knowledge in handling emerging technologies has challenged the uptake of the technologies (Oesterreich and Teuteberg, 2016). Also, the lack of industry standards is hindering the utilisation of digital technologies in the execution of construction projects. With the current maturity and availability of technologies, there exists a lack of standards for these technologies in the market (Oesterreich and Teuteberg, 2016). This has inhibited the drive to change the approaches to executing construction projects through innovative technologies. Furthermore, another prevailing challenge towards adopting laser scanning technology is the time spent converting from point cloud to other enabling platforms for information gathering. For example, the biggest challenge with point cloud to Building Information Modelling (BIM) conversion processes is the time-consuming process (Wang et al., 2020; Qu et al., 2014). In furtherance of the aforementioned challenge, data management of points cloud from various locations coupled with the scan dates can be a huge task (Qu et al., 2014). With the indiscriminate nature of reality capture for point clouds, the generated models habitually comprise extraneous or provisional characteristics in the scene that would intrude with feature detection functions in the modelling process.

The study aimed to evaluate the barriers to the utilisation of laser scanning technology in the delivery of construction projects in South Africa. Adopting a post-positivism philosophical stance, the study used a quantitative approach to eliciting data from the study’s target population, which is construction professionals. The instrument for data collection was a questionnaire, which was advantageous in providing quantifiable data within a short time frame (Tan, 2011). The questionnaire comprised two sections and was self-administered by the researcher through electronic means to the target respondents. The first section focused on the demographic characteristics of the respondents. In contrast, the second section sought the respondents’ views on the challenges to the espousal of laser scanners for construction projects using a five-point Likert scale. A two-pronged sampling technique was deployed for the study using convenience sampling to get respondents with expertise in digital technologies in construction and subsequently followed by a snowball sampling technique based on referrals. This led to around 137 questionnaires filled and returned by the respondents. Data analysis was carried out using percentages for the respondents’ demographic information. As shown in Figure 1, the Cronbach’s alpha test was used to determine the reliability and validity of the research instrument. An alpha value of 0.873 was given, thus indicating the reliability and validity of the research instrument since it is closer to 1.00 (Tavakol and Dennick, 2011). Mean item score was used in ranking the identified barriers to the utilisation of laser scanning technology for construction projects as rated by the respondents based on their significance. Also, the Kruskal−Wallis h-test (K-W) was deployed to ascertain the difference in responses given by the respondents on the barriers to the use of laser scanners for construction projects based on their professional designation. According to Pallant (2005), the Kruskal−Wallis h-test is a non-parametric test used in assessing the significant difference in the opinions of two or more distinct groups. The result of the Kruskal−Wallis h-test gives a chi-square and p-value. It is adjudged that there is no significant difference in the opinion of the groups of respondents when the p-value of a variable is greater than 0.05, while there is a significant difference in the opinion of the groups of respondents when the p-value of a variable is less than or equal to 0.05. Furthermore, the Student Newman Kauls (SNK) post hoc test was used to differentiate the mean responses of the different groups of respondents based on their professional designation. Also, the study used principal component analysis (PCA) in the conduct of exploratory factor analysis (EFA) for the determination of the factor analysis ability and unidimensionality of the barriers identified by the study, as suggested by Oke et al. (2021) and Ikuabe et al. (2022). The essence of factor analysis is the provision of insights into structured patterns, thereby simplifying the understanding of relationship patterns of the factors (Young and Pearce, 2013). The derived constructs from the EFA were further analysed to ascertain their equivalency using confirmatory factor analysis with EQation Software (EQS) version 6.4. This approach has been used in past studies to validate the derived constructs from the EFA (Aghimien et al., 2023; Akinshipe et al., 2024; Chen et al., 2015). The analysis used a multidimensional approach which includes indexes such as Satorra−Bentler scaled chi-square (S-Bχ2), Bentler comparative fit index (CFI), goodness-of-fit index (GFI), root mean square error of approximation with 95% or 90% confidence interval (RMSEA @ 95% or 90% CI), root mean square error of approximation (RMSEA) and standardised root mean square residual (SRMR). Kaplan (2009) noted that these indexes present comparative and incremental absolute fit indexes. Also, they outlay a detailed assessment of the construct’s suitability with the sampled data. A subsequent evaluation was conducted to evaluate the validity and internal consistency of the constructs using the Rho coefficient and Cronbach’s alpha (Bentler, 2005).

Figure 1.

Research framework

Figure 1.

Research framework

Close modal

The demographic characteristics of the respondents show that architects and quantity surveyors made up 11% and 22% of the total respondents of the study, respectively, while construction managers, engineers and construction project managers made up 24%, 30% and 13%, respectively. For the highest educational qualification of the respondents, 59% have a bachelor’s degree, 17% have a master’s degree and 22% have an honour’s degree. Furthermore, based on the years of professional experience, it was revealed that 34% of the total respondents have 5–9 years of professional experience, while 24% and 19% have a professional experience of 1–4 years and 10–14 years, respectively. Based on the current employment designation of the respondents, 64% are affiliated with contracting organisations, 22% with government establishments and 14% with consulting firms.

A total of 12 barriers to the use of laser scanners for construction project execution were identified from the review of extant literature and subsequently presented to respondents for rating based on their level of significance. Table 1 shows the ranking of the identified barriers and the result of the K-W test. From the findings, the most ranked barrier is the lack of awareness of laser scanning technology, with a mean score of 4.39; this is followed by high capital expenditure and resistance to technology adoption, with both barriers having a mean score of 4.27 and 4.19, respectively. This is followed by a lack of government support and lack of training, with mean scores of 3.80 and 3.76, respectively. The least ranked barrier is the long payback period, with a mean score of 3.42. Generally, all the identified barriers have a mean score above 3.00, which shows that they are significant barriers to the espousal of laser scanning technology for construction project delivery in South Africa. Also, the findings from the K-W test show no significant difference in the opinions of the respondents based on their professional designation on 16 of the total number of identified barriers. These 16 barriers have a derived p-value above 0.05, implying a convergent opinion on these barriers among the groups of professionals. However, there is a disparity of opinions among the professionals on the lack of industry standards since the derived p-value is less than 0.05. This divergence of opinions among the groups of professionals might result from the different professional mandates in delivering core professional dictates among the various groups of professionals.

Table 1.

Barriers to the use of laser scanners for construction projects

BarriersX¯RK-W
X2Sig.
Lack of awareness4.3912.8840.728
High capital expenditure4.2725.4810.595
Resistance to technology adoption4.1932.9270.376
Lack of government support4.1249.3770.311
Lack of training4.0557.9380.062
Lack of industry standards4.0162.2740.028**
Demand for high computing systems3.9274.7890.121
Cost of maintenance3.8882.0030.729
Need for high-end computing capacities3.7694.3370.217
Data security3.73101.0940.082
Lack of top management support3.70114.6970.281
Complexity of use3.66122.2870.315
Data management3.66122.7830.794
Profitability worries3.61143.2580.727
Interoperability3.53155.5720.593
Atmospheric challenges3.48165.2290.594
Long payback period on investment3.42176.3970.228
Note:

**Significant at 0.05

Source: Authors’ own work

Resulting from the Kruskal Wallis h-test conducted on the identified barriers to the use of laser scanners for construction project delivery in South Africa, which indicated a divergent opinion on one of the variables among the group of respondents (professional designation), it becomes imperative to unravel the details of the different opinions. Hence, the Student Newman Kauls (SNK) post hoc technique was used. Table 2 shows the result of the post hoc test (multiple comparisons) conducted using the SNK post hoc technique. The findings from the test indicate that the difference in opinion is shown between the two groups of respondents. The first group comprises architects and engineers with values of 2.8266 and 2.9349, respectively. The second group comprises construction managers, construction project managers and quantity surveyors with values of 3.2722, 3.3591 and 3.4011, respectively.

Table 2.

SNK post hoc test

GroupsNSubset for alpha = 0.05
12
Architects172.8266 
Engineers172.9349 
Construction managers17 3.2722
Construction project managers17 3.3591
Quantity surveyors17 3.4011
Sig. 1.0000.431
Notes:

Means for groups in homogeneous subsets are displayed;

a. Uses harmonic mean sample size = 12.000

Source: Authors’ own work

The study used EFA in grouping the identified barriers to using laser scanners for construction project delivery into more manageable constructs. This was conducted using PCA, which adopted varimax rotation. This approach helps reduce a large number of variables into smaller sub-scales attributed to coherent patterns (Tabachnick and Fidell, 2007). Large samples are needed for reasonable outputs in EFA (Hair et al., 2006), hence a total of 137 samples were used for the study. Kaiser−Meyer−Olkin measure of sampling adequacy (KMO) and Bartlett’s test of sphericity were deployed to determine the factorability of the data set. KMO is used in determining the factor homogeneity and ascertaining if the partial correlation of the variables is minimal (Sharma et al., 2013). Table 3 outlines the KMO and Bartlett’s test of the data set. A KMO value of 0.871 is presented, which is above the threshold of 0.6 used in past studies, whilst Bartlett’s test of sphericity gave a value of 2,058.552 and 0.000 as the p-value, proving it to be significant (Pallant, 2005). Consequently, this portrays that the data set for EFA conduct is adequate factorability and suitability. Furthermore, the correlation matrix given in the output is attributed to having a value greater than or equal to 3, affirming the data set’s appropriateness as showcased in past studies (Hair et al., 2006; Ikuabe et al., 2024).

Table 3.

KMO and Bartlett’s test

Kaiser−Meyer−Olkin measure of sampling adequacy0.871
Bartlett’s test of sphericityApprox. chi-square2,058.552
df362
Sig.0.000
Source: Authors’ own work

Table 4 outlines the result of the PCA, which indicates three components whose initial eigenvalue is greater than 1. The first component possesses an eigenvalue of 8.329 and has the highest percentage of variance explained at 24.318%. This is followed by the second component with an initial eigenvalue of 3.273, while the variance explained is 20.466%. The final component has an initial eigenvalue of 1.946, and the variance explained is 17.527%. The cumulative sum of variance explained for the three components is given to be 62.311%, which is above the 50% threshold.

Table 4.

Total variance explained

ComponentInitial eigenvaluesRotation sums of squared loadings
Total% of varianceCumulative %Total% of varianceCumulative %
18.32928.28740.5234.66424.31824.318
23.2739.31941.6283.79620.46644.478
31.9467.71543.5533.32117.52762.311
40.9566.99450.682   
50.8815.20462.821   
60.8734.83964.226   
70.8363.67166.222   
80.8173.52871.538   
90.7922.91676.281   
100.7832.49479.281   
110.7742.27482.027   
120.6841.26785.937   
130.6151.18388.274   
140.5370.93689.539   
150.4730.91494.741   
160.2070.72899.458   
170.1420.553100.00   
Source: Authors’ own work

Table 5 outlines the factor loadings resulting from the EFA conducted using PCA through varimax rotation. It is revealed that the 17 variables identified from the literature are loaded into three components after the required iterations for the analysis. The first component is attributed to having six variables with highly correlated features and factor loadings ranging from 0.881 to 0.654. This component is labelled technological hindrance. The second component comprises five variables whose factor loadings range from 0.763 to 0.503. The component is labelled financial impediments. The third component is labelled institutional challenges and possesses six variables whose factor loadings range from 0.701 to 0.533. Also, the extracted communalities of the factors are shown to be within the range of 0.529–0.886.

Table 5.

Rotated component matrixa

BarriersComponentExtracted
communalities
123
Data management0.881  0.783
Data security0.843  0.886
Need for high end computing capacities0.794  0.825
Atmospheric challenges0.711  0.775
Complexity of use0.682  0.529
Interoperability0.654  0.683
High capital expenditure 0.763 0.728
Cost of maintenance 0.733 0.840
Long payback period on investment 0.673 0.784
Profitability worries 0.639 0.628
Lack of industry standards 0.503 0.716
Lack of awareness  0.7010.582
Lack of top management support  0.6830.865
Resistance to technology adoption  0.6470.729
Demand for high computing systems  0.6230.714
Lack of government support  0.5840.734
Lack of training  0.5330.664 
Notes:

Extraction method: principal component analysis;

a.3 components extracted

Source: Authors’ own work

The result of the EFA conducted on the barriers to the utilisation of laser scanning technology for construction projects gave three constructs. This was further subjected to CFA to affirm its applicability and validity. The robust maximum likelihood was adopted due to the non-normality of the data set. This approach would make up for the non-normality of the data set (Field, 2009). The result of the fit indexes shows that the GFI and CFI gave values of 0.971 and 0.962, respectively. This was deemed a good fit since it is recommended that a good fit is attained when the value given is ≥ 0.95, while an acceptable fit is attained when the value is ≥ 0.90 (Bentler, 2005; Iacobucci, 2010). Also, for the values of SRMR and RMSEA, the values given were 0.056 and 0.064, respectively. These values were adjudged to be acceptable fit since it is recommended that a value for both SRMR and RMSEA is passed as a good fit when the value is ≤ 0.05 when it is an acceptable fit when the value is ≤ 0.08 (Bentler, 2005; Oke and Ogunsemi, 2016; Adekunle et al., 2024). Furthermore, Satorra−Bentler scaled chi-square (S-Bχ2) of 7.346 with 2 degrees freedom with an accompanying p-value of 0.000 was given for the model, thus affirming the model’s adequacy (Kline, 2005; Byrne, 2006).

The assessment of the model’s internal consistency was conducted with the combination of Rho alpha and Cronbach’s alpha tests. Both tests are recommended to generate a more robust value of reliability for the model (Hair et al., 2019). Table 6 shows that the Rho alpha and Cronbach’s alpha values are 0.894 and 0.812, respectively. Thus, this portrays a good model validity since the coefficients are above 0.7 (Hair et al., 2019). Furthermore, it is revealed that the values of the standardised coefficient range from 0.638 to 0.945. This indicates a good construct validity of the model as the coefficients explained are above 50% (0.5) of the total variance explained in the model. Likewise, the values of the z-statistics are all above 1.96, which indicates the significance of the identified barriers to the use of laser scanning technology for construction projects. The grouped factors’ predictive accuracy (R2) is close to 1.0. The coefficients of the derived R2 are 0.784, 0.762 and 0.815, respectively. Figure 2 illustrates the correlation of the constructs making up the model, indicating that they are significant at 0.05.

Table 6.

CFA for hindering factors to the use of laser scanning technology

GroupsLabelStandardised
coefficient (λ)
Z-statisticsR2Significant
at 5% level?
Group R2Cronbach’s
alpha
Rho
coefficient
Technical hindrancesBAR20.9455.2860.621Yes0.7840.894 0.812
 BAR40.8267.3070.794Yes
 BAR60.81510.0140.772Yes
 BAR80.7245.5880.618Yes
 BAR90.7099.1320.709Yes
 BAR130.8127.9360.683Yes
Financial impedimentsBAR10.80311.0260.813Yes0.762
 BAR30.7278.2640.592Yes
 BAR100.8849.2750.711Yes
 BAR140.7134.7820.638Yes
 BAR160.8429.3810.784Yes
Institutional challengesBAR50.6388.7520.817Yes0.815 
 BAR70.8287.2750.826Yes
 BAR110.8976.3910.639Yes
 BAR120.8169.7220.587Yes
 BAR150.7737.6390.707Yes
 BAR170.6395.5170.661Yes
Source: Authors’ own work
Figure 2.

Construct model for barriers to the use of laser scanning technology for construction projects

Figure 2.

Construct model for barriers to the use of laser scanning technology for construction projects

Close modal

The barriers to the uptake of laser scanning technology for construction projects were assessed in this study. The analysis results showed that the most significant barrier to the espousal of technology in the South African construction industry is the lack of awareness of technology among stakeholders in the construction industry. This finding is corroborated by Leite et al. (2016), who noted that the emergence of innovative technologies is at a fast pace. Hence, most stakeholders are not keeping tabs on the introduction of these technologies. Moreover, there is not enough disseminated information on these innovative technologies and their accompanying benefits when adopted for construction project delivery, leading to a lack of awareness among construction stakeholders. Also, the study shows that the high cost of procuring innovative technologies such as laser scanners hinders its uptake. This is affirmed by Shanbari et al. (2016), stating that the cost of purchase, installation, maintenance, upgrade and training all culminate towards posing as a barrier to the uptake of laser scanning technology for construction projects. The resistance to adopting new technologies by stakeholders in the construction industry is equally a challenge towards the uptake of technologies such as laser scanners (Dimick, 2014). This results from the belief that emerging technologies would usher in the loss of jobs, leading to foot-dragging towards using technologies such as laser scanners. Furthermore, the study’s findings show that all the professionals making up the respondents of the study have a converging viewpoint regarding the identified barriers towards the uptake of laser scanning technology, except for the lack of industry standards. This might not be unconnected with the different professional dictates in delivering core professional mandates among the various groups of professionals.

Component 1 − technical hindrances.

The first component resulting from the EFA is labelled as technical hindrances and is attributed to six variables, namely, data management, data security, the need for high-end computing capacities, atmospheric challenges, the complexity of use and interoperability. These findings are corroborated by Shanbari et al. (2016), who noted that hardware and software with high-end computing capacities are required to handle and process large data sizes generated. As a result of the nature of data generated by the use of laser scanning technology, the management of data might prove to be cumbersome (Benli, 2015; Tang et al., 2022; Noruwa et al., 2022; Qiu et al., 2022). Also, laser scanners are susceptible to harsh environmental conditions such as humidity, rainfall and sunshine since they are mostly used outdoors. This result implies that technical hindrances significantly impede the use of laser scanning technology. Consequently, professionals and stakeholders in the construction industry are not disposed to implementing the technology since there is no clear direction for navigating the challenges.

Component 2 − financial impediments.

The second component is labelled as financial impediments and consists of five items: high capital expenditure, maintenance cost, the long payback period on investment, profitability worries and lack of industry standards. The cost of digital technologies has been portrayed as a significant barrier to their espousal for construction projects. Leite et al. (2016) opined that costs of purchase, operations and maintenance is a deterrent to inculcating digital technologies for activities in construction projects. Moreover, the fear of a long payback period resulting from investing in digital technologies can be a barrier to committing funds to propagate its purchase (Utica et al., 2017). Hence, the result shows that the financial impediments serve as a significant bottleneck in the quest to use the technology. A clear pathway of the financial implications associated with the deployment of laser scanning technology would aid in the abatement of the pitfall.

Component 3 − institutional challenges.

The third component is labelled institutional challenges and consists of a lack of awareness, lack of top management support, resistance to technology adoption, demand for high computing systems, lack of government support and lack of training. This finding is supported by Royal Institution of Chartered Surveyors (RICS) (2018) by noting that a key aspect of the human element pushing back the espousal of innovative technologies is the opposition to change by stakeholders. Since stakeholders are accustomed to traditional approaches to construction project execution, resistance is exhibited towards alternative approaches and techniques. Also, the lack of the requisite skills and knowledge in handling emerging technologies has challenged the uptake of digital technologies (Oesterreich and Teuteberg, 2016; Hosamo and Hosamo, 2022; Skrzypczak et al., 2022). The findings imply that the institutional problems associated with the espousal of laser scanning technology are significant barriers. Consequently, stakeholders and professionals in the construction industry should be well-equipped with advancements in innovative technologies. Relevant stakeholders and the government should lend their support towards the shift towards the deployment of such technologies.

Theoretical and practical implications.

Laser scanning technology offers precision in data collection, which aids in driving optimised project execution. However, the deployment of the technology for construction projects is faced with challenges, as shown in the study as technical hindrances, financial impediments and institutional challenges. Issues bothering data security and standards create interoperability challenges across projects and teams, leading to a slow project timeline resulting from compliant risks and data processing. Also, financial constraints can pose a significant barrier to using laser scanning technology. This suggests that theoretical models of cost-benefit in construction technology call for recalibration to address some of the issues on initial costs, particularly for small and medium-sized organisations. Furthermore, there is a need to review industry standardisation and regulatory compliance, highlighting the necessity of unified protocols for data management and sharing. The current framework contributes to the bottlenecks associated with the advancement of collaborative workflows in construction project delivery, hence slowing down the development of an integrated ecosystem for driving emerging technologies.

The study empirically assessed the inhibitors to the espousal of laser scanning technology for project delivery in the South African construction industry. As a result of the review of extant literature, 17 variables were identified and presented to the study’s respondents for the rating with a well-structured questionnaire. Data from the survey were subjected to statistical analysis, which made interesting revelations. Firstly, it was shown that the most significant barriers to the uptake of laser scanners for construction projects are lack of awareness, high capital expenditure, resistance to technology adoption and lack of government support. Furthermore, it was revealed that all the groups of professionals making up the respondents of the study all had an agreement on sixteen of the identified barriers and also had a diverging opinion on one of the barriers, which is the lack of industry standards. Furthermore, it was shown from the conduct of EFA that three constructs make up the barriers to using laser scanning technology for construction projects in South Africa. These are technical hindrances, financial impediments and institutional challenges. These developed constructs were further subjected to a CFA, which established their equivalency. The model assessment was conducted using different comparative fit indexes using a multidimensional approach. The result from the CFA affirmed the significance of the three constructs that hinder the use of laser scanning technology for construction project delivery.

Based on the findings from the study, it is recommended that relevant professional bodies in the construction industry embark on a massive awareness campaign that would help propagate the benefits of laser scanning technology and subsequently aid in the uptake in the delivery of construction projects. Consequently, in closing the gulf of the current expertise available, committed and intentional efforts by relevant stakeholders should be geared towards improving the knowledge base of handling emerging technologies. Also, it is encouraged that the government implement subsidy regimes to encourage the drive for the uptake of innovative technologies such as laser scanners. This would help abate the effect of the high purchase cost and investing in such technologies. This study contributes to the body of knowledge as it unravels the impeding factors to the utilisation of laser scanners for construction project delivery. Also, it serves as a solid theoretical base for further studies on the espousal of digital technologies for effective project delivery. It is important to state that this study was limited to the Gauteng province of South Africa. Other studies can be conducted in other provinces of the country for a more robust and comprehensive finding. Also, the study used a quantitative methodological approach; future studies can adopt a quantitative approach.

Abdul Shukor
,
S.A.
,
Wong
,
R.
,
Rushforth
,
E.
,
Basah
,
S.N.
and
Zakaria
,
A.
(
2015
), “
3D terrestrial laser scanner for managing existing building
”,
Jurnal Teknologi
, Vol.
76
No.
12
, doi: .
Adekunle
,
P.
,
Aigbavboa
,
C.
,
Akinradewo
,
O.
,
Ikuabe
,
M.
and
Otasowie
,
K.
(
2024
), “
Towards the uptake of digital technologies for construction information management: a partial least square structural equation modelling approach
”,
Buildings
, Vol.
14
No.
3
, p.
827
, doi: .
Aghimien
,
L.M.
,
Aigbavboa
,
C.O.
,
Anumba
,
C.J.
and
Thwala
,
W.D.
(
2023
), “
A confirmatory factor analysis of the challenges of effective management of construction workforce in South Africa
”,
Journal of Engineering, Design and Technology
, Vol.
21
No.
4
, pp.
1134
-
1152
, doi: .
Aghimien
,
D.
,
Ikuabe
,
M.
,
Aghimien
,
L.M.
,
Aigbavboa
,
C.
,
Ngcobo
,
N.
and
Yankah
,
J.
(
2022
), “
PLS-SEM assessment of the impediments of robotics and automation deployment for effective construction health and safety
”,
Journal of Facilities Management
, Vol.
22
No.
3
, pp.
458
-
478
, doi: .
Akanmu
,
A.
,
Anumba
,
C.
and
Messner
,
J.
(
2014
), “
Critical review of approaches to integrating virtual models and the physical construction
”,
International Journal of Construction Management
, Vol.
14
No.
4
, pp.
267
-
282
, doi: .
Akinshipe
,
O.
,
Ikuabe
,
M.
,
Adekunle
,
S.A.
and
Aigbavboa
,
C.
(
2024
), “
Empirical assessment of the impacts of Sino-African cross border relations in the construction industry: a confirmatory factor analysis approach
”,
International Journal of Building Pathology and Adaptation
, Vol.
42
No.
7
, pp.
18
-
34
, doi: .
Aryan
,
A.
,
Bosché
,
F.
and
Tang
,
P.
(
2021
), “
Planning for terrestrial laser scanning in construction: a review
”,
Automation in Construction
, Vol.
125
, p.
103551
, doi: .
Benli
,
G.
(
2015
), “The advantages of using laser scanners in surveying in protected sites: a case study in historical peninsula in Instanbul”, in
Brusaporci
,
S.
(Ed.),
Handbook of Research on Emerging Digital Tools for Architectural Surveying, Modeling, and Representation
,
University of L’ Aquila
,
Italy
, pp.
382
-
402
.
Bentler
,
P.M.
(
2005
),
EQS 6 Structural Equation Program Manual
,
Multivariate Software
,
Encino. CA
.
Berk
,
N.
and
Bicen
,
S.
(
2018
), “
Casuality between the construction sector and GDP growth in emerging countries: the case of Turkey
”,
Athens Journal of Mediterranean Studies
, Vol.
4
No.
1
, pp.
19
-
36
.
Bosche
,
F.
(
2012
), “
Plane-based registration of construction laser scans with 3D/4D building models
”,
Advanced Engineering Informatics
, Vol.
26
No.
1
, pp.
90
-
102
, doi: .
Brilakis
,
I.
,
Lourakis
,
M.
,
Sacks
,
R.
,
Savarese
,
S.
,
Christodoulou
,
S.
,
Teizer
,
J.
and
Makhmalbaf
,
A.
(
2010
), “
Toward automated generation of parametric BIMs based on hybrid video and laser scanning data
”,
Advanced Engineering Informatics
, Vol.
24
No.
4
, pp.
456
-
465
.
Byrne
,
B.M.
(
2006
),
Structural Equation Modelling with EQS-Basic Concepts, Applications and Programming
,
Lawrence Erlbaum Associates
,
Mahwah
.
Chen
,
P.Y.
,
Yang
,
C.M.
and
Morin
,
C.M.
(
2015
), “
Validating the cross-cultural factor structure and invariance property of the insomnia severity index: evidence based on ordinal EFA and CFA
”,
Sleep Medicine
, Vol.
16
No.
5
, pp.
598
-
603
.
Dimick
,
S.
(
2014
),
Adopting Digital Technologies: The Path for SMEs
,
The conference board of Canada
,
Ottawa
.
Dinis
,
F.M.
,
Sanhudo
,
L.
,
Martins
,
J.P.
and
Ramos
,
N.M.
(
2020
), “
Improving project communication in the architecture, engineering and construction industry: coupling virtual reality and laser scanning
”,
Journal of Building Engineering
, Vol.
30
, p.
101287
, doi: .
Field
,
A.
(
2009
),
Discovering Statistics Using SPSS for Windows
, ( (3rd edn.) ),
Sage Publications
,
London
.
Gleason
,
K.E.
,
Nolin
,
A.W.
and
Roth
,
T.R.
(
2013
), “
Charred forests increase snowmelt: effects of burned woody debris and incoming solar radiation on snow ablation
”,
Geophysical Research Letters
, Vol.
40
No.
17
, pp.
4654
-
4661
.
Göçer
,
Ö.
,
Hua
,
Y.
and
Göçer
,
K.
(
2016
), “
A BIM-GIS integrated pre-retrofit model for building data mapping
”,
Building Simulation
, Vol.
9
No.
5
, pp.
513
-
527
.
Gonzalez-Jorge
,
H.
,
Solla
,
M.
,
Armesto
,
J.
and
Arias
,
P.
(
2012
), “
Novel method to determine laser scanner accuracy for applications in civil engineering
”,
Optica Applicata
, Vol.
43
No.
1
, pp.
43
-
53
.
Guldur
,
B.
and
Hajjar
,
J.F.
(
2014
), “
Automated damage assessment from 3-D laser scans
”,
Proceedings of the Istanbul Bridge Conference
,
Istanbul, Turkey
, pp.
1
-
11
.
Hair
,
J.F.
,
Risher
,
J.J.
,
Sarstedt
,
M.
and
Ringle
,
C.M.
(
2019
), “
When to use and how to report the results of PLS-SEM
”,
European Business Review
, Vol.
31
No.
1
, pp.
2
-
24
.
Hair
,
J.F.
,
Black
,
W.C.
,
Babin
,
B.J.
,
Anderson
,
R.E.
and
Tatham
,
R.L.
(
2006
),
Multivariate Data Analysis
, (6th Edn)
Pearson Prentice Hall, Pearson Education, Inc
,
Upper Saddle River, NJ 07458
.
Hosamo
,
H.H.
and
Hosamo
,
M.H.
(
2022
), “
Digital twin technology for bridge maintenance using 3D laser scanning: a review
”,
Advances in Civil Engineering
, Vol.
2022
No.
1
, p.
2194949
.
Huber
,
D.
,
Akinci
,
B.
,
Tang
,
P.
,
Adan
,
A.
,
Okorn
,
B.
and
Xiong
,
X.
(
2010
), “
Using laser scanners for modeling and analysis in architecture, engineering, and construction
”,
2010 44th Annual Conference on Information Sciences and Systems (CISS)
,
Princeton
,
NJ, USA
, pp.
1
-
6
, doi: .
Iacobucci
,
D.
(
2010
), “
Structural equations modeling: fit indices, sample size, and advanced topics
”,
Journal of Consumer Psychology
, Vol.
20
No.
1
, pp.
90
-
98
.
Ikuabe
,
M.
and
Oke
,
A.
(
2019
), “
Contractors’ opportunism: construction professionals’ awareness of influencing factors
”,
Journal of Engineering, Design and Technology
, Vol.
17
No.
1
, pp.
102
-
114
.
Ikuabe
,
M.
,
Oke
,
A.
and
Aigbavboa
,
C.
(
2020a
), “
Impact of contractors’ opportunism on construction project transaction costs: construction professionals’ perception
”,
Journal of Financial Management of Property and Construction
, Vol.
25
No.
1
, pp.
125
-
141
, doi: .
Ikuabe
,
M.
,
Aghimien
,
D.
,
Aigbavboa
,
C.
and
Oke
,
A.
(
2020b
), “
Exploring the adoption of digital technology at the different phases of construction projects in South Africa
”,
Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, UAE, March, 10-12
.
Ikuabe
,
M.O.
,
Aigbavboa
,
C.
,
Anumba
,
C.
and
Oke
,
A.E.
(
2024
), “
Structural determinants of the uptake of cyber-physical systems for facilities management – a confirmatory factor analysis approach
”,
Smart and Sustainable Built Environment
, doi: .
Ikuabe
,
M.
,
Aigbavboa
,
C.
,
Thwala
,
W.
,
Chiyangwa
,
D.
and
Oke
,
A.
(
2022
), “
Risks of joint venture formation in the South African construction industry
”,
International Journal of Construction Management
, Vol.
23
No.
14
, pp.
2391
-
2399
, doi: .
Jarkas
,
A.
(
2015
), “
Factors influencing labour productivity in Bahrain’s construction industry
”,
International Journal of Construction Management
, Vol.
15
No.
1
, pp.
94
-
108
, doi: .
Kaplan
,
D.
(
2009
),
Structural Equation Modeling: Foundations and Extensions
, ( (2nd edn.) ),
Sage
,
Thousand Oaks, CA
.
Kline
,
R.B.
(
2005
),
Principles and Practice of Structural Equation Modelling
, ( (2nd edn.) ),
Guilford Press
,
New York, NY
.
Lachat
,
E.
,
Landes
,
T.
and
Grussenmeyer
,
P.
(
2017
), “
Investigation of a combined surveying and scanning device: the trimble SX10 scanning total station
”,
Sensors
, Vol.
17
No.
4
, p.
730
.
Leite
,
F.
,
Cho
,
Y.
,
Behzadan
,
A.
,
Lee
,
S.
,
Choe
,
S.
,
Fang
,
Y.
,
Akhavian
,
R.
and
Hwang
,
S.
(
2016
), “
Visualization, information modeling, and simulation: grand challenges in the construction industry
”,
Journal of Computing in Civil Engineering
, Vol.
30
No.
6
, p.
4016035
, doi: .
Liu
,
X.
,
Eybpoosh
,
M.
and
Akinci
,
B.
(
2012
), “
Developing as-built building information model using construction process history captured by a laser scanner and a camera
”,
Construction Research Congress 2012
,
May 21-23
,
West Lafayette, IN, United States
.
Maleek
,
R.
,
Litchi
,
D.
and
Ruwanpura
,
J.
(
2018
), “
Robust segmentation of planar and linear features of terrestrial laser scanner point clouds acquired from construction sites
”,
Sensors
, Vol.
18
No.
3
, pp.
1
-
30
.
Manoharan
,
K.
,
Dissanayake
,
P.
,
Pathirana
,
C.
,
Deegahawature
,
D.
and
Silva
,
R.
(
2020
), “
Assessment of critical factors influencing the performance of labour in Sri Lankan construction industry
”,
International Journal of Construction Management
, Vol.
23
No.
1
, doi: .
Meadati
,
P.
,
Irizarry
,
J.
and
Liou
,
F.
(
2013
), “Teaching using 3D laser scans”,
49th ASC Annual International Conference Proceedings
,
April 10-13
,
San Luis Obispo, California
.
Mulder
,
H.
(
2013
), “
An analysis of the state of innovation in the South African construction industry
”, unplished Msc dissertation at
University of Pretoria
,
South Africa
.
Murtiyoso
,
A.
and
Grussenmeyer
,
P.
(
2018
), ““
Comparison and assessment of 3D registration and georeferencing approaches of point clouds in the case of exterior and interior heritage building recording
”,
ISPRS TC II Mid-Term Symposium” Towards Photogrammetry 2020
, Vol.
42
, pp.
745
-
751
.
Mustapha
,
Z.
,
Aigbavboa
,
C.
and
Thwala
,
W.
(
2016
), “
Small and medium-sized enterprises contractors’ health and safety performance
”,
International Conference of Socio-economic Researchers
,
Johannesburg, South Africa
.
Nguyen
,
T.
,
Nguyen
,
P.
and
Do
,
S.
(
2020
), “
Application of BIM and 3D laser scanning for quantity management in construction projects
”,
Advances in Civil Engineering
, Vol.
2020
No.
1
, pp.
1
-
10
.
Noruwa
,
B.I.
,
Arewa
,
A.O.
and
Merschbrock
,
C.
(
2022
), “
Effects of emerging technologies in minimising variations in construction projects in the UK
”,
International Journal of Construction Management
, Vol.
22
No.
11
, pp.
2199
-
2206
.
Oesterreich
,
T.
and
Teuteberg
,
F.
(
2016
), “
Understanding the implications of digitisation and automation in the context of industry 4.0: a triangulation approach and elements of a research agenda for the construction industry
”,
Computers in Industry
, Vol.
83
, pp.
121
-
139
.
Oke
,
A.E.
and
Ogunsemi
,
D.R.
(
2016
), “
Structural equation modelling of construction bond administration
”,
Journal of Financial Management of Property and Construction
, Vol.
21
No.
3
, pp.
192
-
211
.
Oke
,
A.E.
,
Kineber
,
A.F.
,
Albukhari
,
I.
,
Othman
,
I.
and
Kingsley
,
C.
(
2021
), “
Assessment of cloud computing success factors for sustainable construction industry: the case of Nigeria
”,
Buildings
, Vol.
11
No.
2
, pp.
1
-
15
.
Pallant
,
J.
(
2005
),
SPSS Survival Manual: A Step-by-Step Guide to Data Analysis Using SPSS for Windows (Version 12)
,
Allen and Unwin
,
Crow’s Nest
.
Pawłowicz
,
J.
,
Szafranko
,
E.
and
Harasymiuk
,
J.
(
2018
), “
3D laser scanning in civil engineering - measurements of volume of earth masses
”,
IOP Conference Series: Materials Science and Engineering
, Vol.
324
No.
1
, p.
12005
.
Qiu
,
Q.
,
Wang
,
M.
,
Guo
,
J.
,
Liu
,
Z.
and
Wang
,
Q.
(
2022
), “
An adaptive down-sampling method of laser scan data for scan-to-BIM
”,
Automation in Construction
, Vol.
135
, p.
104135
.
Qu
,
T.
,
Coco
,
J.
,
Rönnäng
,
M.
and
Sun
,
W.
(
2014
), “
Challenges and trends of implementation of 3D point cloud technologies in building information modeling (BIM): case studies
”,
International Conference on Computing in civil and Building Engineering
,
June 23-25
,
Orlando, FL
, pp.
809
-
816
.
Rachid
,
Z.
,
Toufik
,
B.
and
Mohammed
,
B.
(
2019
), “
Causes of schedule delays in construction projects in Algeria
”,
International Journal of Construction Management
, Vol.
19
No.
5
, pp.
371
-
381
, doi: .
Royal Institution of Chartered Surveyors (RICS)
(
2018
),
Big Data: A New Revolution in the UK Facilities Management Sector
,
Royal Institution of Chartered Surveyors (RICS
,
London
).
Sepasgozar
,
S.
,
Lim
,
S.
,
Shirowzhan
,
S.
and
Kim
,
Y.
(
2014
), “
Implementation of as-built information modelling using mobile and terrestrial lidar systems.” Proceedings from
31st International Symposium on Automation and Robotics in Construction and Mining (ISARC)
, pp.
1
-
8
.
Sepasgozara
,
S.
,
Limb
,
S.
,
Shirowzhanc
,
S.
,
Kimd
,
Y.
and
Nadoushanie
,
Z.
(
2015
), “
Utilisation of a new terrestrial scanner for reconstruction of as-built models: a comparative study, ISARC
”,
Proceedings of the International Symposium on Automation and Robotics in Construction
,
Vilnius Gediminas Technical University, Department of Construction Economics and Property
.
Shanbari
,
H.
,
Blinn
,
N.
and
Issa
,
R.
(
2016
), “
Laser scanning technology and BIM in construction management education
”,
Journal of Information Technology in Construction
, Vol.
21
, pp.
204
-
217
.
Shang
,
G.
,
Pheng
,
L.
and
Hui
,
W.
(
2020
), “
Drivers and barriers for multiskilling workers in the Singapore construction industry
”,
International Journal of Construction Management
, Vol.
20
No.
4
, pp.
289
-
304
, doi: .
Sharma
,
R.S.
,
Alexander
,
N.
,
Ho
,
W.
and
Arasu
,
P.
(
2013
), “
Functional modelling and analysis of IDM e-tailer platforms
”,
International Journal of E-Business Research
, Vol.
7
No.
20101
, pp.
38
-
59
.
Skrzypczak
,
I.
,
Oleniacz
,
G.
,
Leśniak
,
A.
,
Zima
,
K.
,
Mrówczyńska
,
M.
and
Kazak
,
J.K.
(
2022
), “
Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements
”,
Building Research and Information
, Vol.
50
No.
8
, pp.
859
-
880
.
Sultan
,
M.
and
Kajewski
,
S.
(
2013
), ““
The Yemen construction industry: readying the industry for the successful implementation of sustainability
”,
Proceedings of the International Conference on Smart and Sustainable Built Environment
,
Brisbane, Australia
, pp.
19
-
21
.
Szafranko
,
E.
and
Pawlowicz
,
J.
(
2017
), “
The application of a 3D laser scanner in contemporary education of civil engineering students
”,
IOP Conference Series: Materials Science and Engineering
, Vol.
251
No.
1
, p.
12001
.
Tabachnick
,
B.
and
Fidell
,
L.
(
2007
),
Using Multivariate Statistics
, (5th Ed)
Allyn and Bacon
,
New York, NY
.
Tan
,
P.
(
2011
), “
Towards a culturally sensitive and deeper understanding of ‘rote learning’ and memorization of adult learners
”,
Journal of Studies in International Education
, Vol.
15
No.
2
, pp.
124
-
145
.
Tang
,
X.
,
Wang
,
M.
,
Wang
,
Q.
,
Guo
,
J.
and
Zhang
,
J.
(
2022
), “
Benefits of terrestrial laser scanning for construction QA/QC: a time and cost analysis
”,
Journal of Management in Engineering
, Vol.
38
No.
2
, p.
5022001
, doi: .
Tavakol
,
M.
and
Dennick
,
R.
(
2011
), “
Making sense of Cronbach’s alpha
”,
International Journal of Medical Education
, Vol.
2
, pp.
53
-
55
.
Tkac
,
M.
,
Mesaros
,
P.
and
Mandicak
,
T.
(
2018
), “
Terrestrial laser scanning – effective technology for creating building information models
”,
Pollack Periodica
, Vol.
13
No.
3
, pp.
61
-
72
.
Torok
,
M.M.
,
Golparvar-Fard
,
M.
and
Kochersberger
,
K.B.
(
2013
), “
ImageBased automated 3D crack detection for post-disaster building assessment
”,
Journal of Computing in Civil Engineering
,
Technical Paper
, Vol.
A4014004
, pp.
1
-
13
.
Uotila
,
U.
,
Saari
,
A.
and
Junnonen
,
J.
(
2021
), “
Investigating the barriers to laser scanning implementation in building refurbishment
”,
Journal of Information Technology in Construction (ITcon)
, Vol.
26
, pp.
249
-
262
, doi: .
Ustinovichius
,
L.
,
Popov
,
V.
,
Cepurnaite
,
J.
,
Vilutienė
,
T.
,
Samofalov
,
M.
and
Miedziałowski
,
C.
(
2018
), “
BIM-based process management model for building design and refurbishment
”,
Archives of Civil and Mechanical Engineering
, Vol.
18
No.
4
, pp.
668
-
678
.
Utica
,
G.
,
Pinti
,
L.
,
Guzzoni
,
L.
,
Bonelli
,
S.
and
Brizzolari
,
A.
(
2017
), “
Integrating laser scanner and bim for conservation and reuse the lyric theatre of Milan
”,
ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences
, Vol.
IV-5/W1
No.
1
, pp.
77
-
82
.
Wang
,
Q.
,
Tan
,
Y.
and
Mei
,
Z.
(
2020
), “
Computational methods of acquisition and processing of 3D point cloud data for construction applications
”,
Archives of Computational Methods in Engineering
, Vol.
27
No.
2
, pp.
479
-
499
.
Windapo
,
A.
and
Cattell
,
K.
(
2013
), “
The South African construction industry: perceptions of key challenges facing its performance, development and growth
”,
Journal of Construction in Developing Countries
, Vol.
18
No.
2
, pp.
65
-
79
.
Wu
,
C.
,
Yuan
,
Y.
,
Tang
,
Y.
and
Tian
,
B.
(
2021
), “
Application of terrestrial laser scanning (TLS) in the architecture, engineering and construction (AEC) industry
”,
Sensors
, Vol.
22
No.
1
, p.
265
, doi: .
Young
,
A.G.
and
Pearce
,
S.
(
2013
), “
A beginner’s guide to factor analysis: focusing on exploratory factor analysis
”,
Tutorials in Quantitative Methods for Psychology
, Vol.
9
No.
2
, pp.
79
-
94
.
Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence maybe seen at Link to the terms of the CC BY 4.0 licenceLink to the terms of the CC BY 4.0 licence.

or Create an Account

Close Modal
Close Modal