Article navigation

The search for an improved mechanised method of maintaining railway track to the correct level and alignment led to the development of the Stoneblower, a machine that lifts the rail and attached sleepers and pneumatically injects the required amount of 20 mm stone into the void created. This minimises disturbance to the existing well-compacted ballast. By 1999 a fleet of Stoneblowers was fully operational across the UK rail network and achieving target rates of track maintenance. This paper compares the track-quality data recorded before, during and after Stoneblower maintenance and confirms the potential of the Stoneblower. Detailed analysis of the data has given a better understanding of the performance, and has provided guidance for optimising the deployment of the Stoneblowers and the stoneblowing procedures.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options