This paper introduces and describes the promotion, development and procurement of the New Tyne Crossing; the construction of a new vehicle tunnel followed by refurbishment of the existing Tyne Tunnel. A suite of papers is planned to cover the construction phase and specific issues of interest. The strategy was to award a concession for the financing, design, construction and operation of the new tunnel, refurbishment and operation of the existing tunnel and operation of the Tyne pedestrian and cyclist tunnels, for a period of 30 years. The intention of the Tyne and Wear Passenger Transport Authority was to transfer the traffic risk and significant design and construction risk to the concessionaire as part of a public–private partnership (PPP) contract. This was subsequently achieved with the award of the contract to TT2/Bouygues TP in November 2007. The project boasts a number of UK firsts: a PPP for which funding has been secured totally from the revenue generated from the tolls and the first UK vehicle tunnel to have an active fire suppression system.
Article navigation
November 2011
Research Article|
November 01 2011
Promoting, developing and procuring the New Tyne Crossing
Paul Fenwick, BSc (Hons), CEng, FICE;
Paul Fenwick, BSc (Hons), CEng, FICE
Project Director
New Tyne Crossing Project, Tyne & Wear Integrated Transport Authority, Newcastle Upon Tyne, UK
Search for other works by this author on:
Cliff Jessett, BSc, PgD, PhD, CEng, C.Env, MCIWEM;
Cliff Jessett, BSc, PgD, PhD, CEng, C.Env, MCIWEM
Project Manager
New Tyne Crossing Project, Tyne & Wear Integrated Transport Authority, Newcastle Upon Tyne, UK
Search for other works by this author on:
David Dingwall, BSc (Hons), CEng, FICE;
David Dingwall, BSc (Hons), CEng, FICE
Technical Manager
New Tyne Crossing Project, Tyne & Wear Integrated Transport Authority, Newcastle Upon Tyne, UK
Search for other works by this author on:
Nigel Hailey, BSc, CEng, MICE
Nigel Hailey, BSc, CEng, MICE
Director of Arup
Technical Advisors to Tyne & Wear Integrated Transport Authority, on New Tyne Crossing, Newcastle Upon Tyne, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
May 03 2011
Accepted:
May 03 2011
Online ISSN: 1751-7710
Print ISSN: 0965-092X
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Transport (2011) 164 (4): 259–267.
Article history
Revision Received:
May 03 2011
Accepted:
May 03 2011
Citation
Fenwick P, Jessett C, Dingwall D, Hailey N (2011), "Promoting, developing and procuring the New Tyne Crossing". Proceedings of the Institution of Civil Engineers - Transport, Vol. 164 No. 4 pp. 259–267, doi: https://doi.org/10.1680/tran.2011.164.4.259
Download citation file:
New and popular articles
Suggested Reading
Geomorphological assessments for transport infrastructure projects
Proceedings of the Institution of Civil Engineers - Transport (August,2003)
Locating blockages in buried (telecoms) ducts: a new approach
Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction (November,2021)
Levels of governance in post-disaster urban planning
Proceedings of the Institution of Civil Engineers - Urban Design and Planning (June,2009)
A cellular automata approach for the hydro-power operation of multi-reservoir systems
Proceedings of the Institution of Civil Engineers - Water Management (October,2013)
Infrastructure cost planning: a design-led approach
Proceedings of the Institution of Civil Engineers - Municipal Engineer (September,2007)
Related Chapters
Infrastructure digital technology requires systems-thinking
Doing it Differently: Systems for rethinking infrastructure
Substructures
ICE Manual of Bridge Engineering
The subsurface as the final urban frontier
Underground Spaces Unveiled: Planning and creating the cities of the future
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
