Open figure viewer
This Paper describes the construction of the River Avon bridges and, in particular, the temporary works adopted to span the River Avon at the two crossing points.
Keywords:
R M Douglas Construction,
Bridges,
Motorways,
M40,
Construction,
Rivers,
Works,
Temporary,
A41,
Planning,
Soffits,
Decks,
Banks,
Piles,
Sheetpiling,
Sheetpiles,
Spans,
Abutments,
Piers,
Girders,
Columns,
Concrete,
Reconstruction,
Widening,
Plant,
Equipment,
Cranes,
River Avon,
Uk
This content is only available via PDF.
© Thomas Telford and ICE
1993
You do not currently have access to this content.
