The North Hollywood Project is a 10 km twin tunnel extension to the Los Angeles Metro Red Line valued at US$1·3 billion. The extension includes three stations constructed by cut and cover methods, together with the rail track, the necessary support systems, and rolling stock. This paper covers the main civil engineering construction of the project. The construction of the cut and cover stations is described. A number of interesting features of the tunnel construction are described, including the boring of the main running tunnels using tunnel boring machines (TBMs), the construction of a special seismic section of oversize tunnel through a major fault using shotcrete lining, track level rooms, starter tunnels and cross passages between running tunnels. An important emphasis of the paper is on the rock tunnels driven by the TBMs. The difficulties caused by severe geological conditions include dealing with water at high pressure and fissure grouting to reduce water inflow through the permanent lining. Both the temporary and the permanent tunnel lining are described.
Article navigation
February 2000
Research Article|
February 01 2000
The North Hollywood Project, Los Angeles
A. R. Biggart, OBE, FEng, FICE;
A. R. Biggart, OBE, FEng, FICE
Project Manager
JMA Joint Venture
, and Vice President, Hatch Mott MacDonaldHollywood
Search for other works by this author on:
J. Hawley, MA, MICE, MASCE;
J. Hawley, MA, MICE, MASCE
Project Manager
Construction, JMA Joint Venture
, and Vice President, Hatch Mott MacDonaldHollywood
Search for other works by this author on:
J. Townsend, BSc, FICE
J. Townsend, BSc, FICE
Resident Engineer
Contract C311, JMA Joint Venture
, and Associate, Hatch Mott MacDonaldHollywood
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2000 Thomas Telford Ltd
2000
Proceedings of the Institution of Civil Engineers - Transport (2000) 141 (1): 43–56.
Citation
Biggart AR, Hawley J, Townsend J (2000), "The North Hollywood Project, Los Angeles". Proceedings of the Institution of Civil Engineers - Transport, Vol. 141 No. 1 pp. 43–56, doi: https://doi.org/10.1680/tran.2000.141.1.43
Download citation file:
208
Views
New and popular articles
Suggested Reading
Elastic settlement of square footings on a two-layer deposit
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (April,2010)
Behaviour of joints containing clay infill under constant normal stiffness, with and without bolting
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2001)
Geotechnical analysis of a retaining wall in weak rock
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (January,2004)
APPLICATION OF THE DISTINCT ELEMENT METHOD FOR ROCK MECHANICS PROBLEMS
Engineering Computations (February,1992)
Contributions to Géotechnique 1948–2008: Engineering geology, rock mechanics and rock engineering
Geotechnique (June,2008)
Related Chapters
1 Introduction
Rock engineering
2 Geology in rock engineering
Rock engineering
3 Investigations and measurements
Rock engineering
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
