Immersed tube tunnels may be considered to be particularly suited to a design-and-construct form of contract, in that there is considerable influence on the permanent structure by the temporary works required for the float-out and immersion of the tunnel elements. The scope of the reference design produced by the engineer for the Medway Tunnel project, which allowed tenders to be sought, afforded flexibility for the tenderers in their options for constructing the immersed tunnel, the cut-and-cover tunnels, and their approaches. This paper discusses the designs carried out by Mott MacDonald for the various forms of construction employed on the project by the contractor. These works include the cut-and-cover tunnels which were constructed using permanent diaphragm walls or with cast-in-place concrete within a temporary combi-pile wall arrangement, the piled slabs and gravity structures which were employed on the open approaches, the innovative sand-placing method used for the embankment built on very soft ground, and the immersed tunnel itself. The paper also addresses the coordination required in the design-and-construct process between the designer and contractor, and also between the civil and mechanical and electrical works. Finally, the paper discusses some of the technical complications encountered during the construction of the project, and how the design-and-construct form of contract was beneficial in achieving a rapid and satisfactory solution.
Article navigation
February 2000
Research Article|
February 01 2000
The detailed design of the Medway Tunnel project Available to Purchase
G. D. Mainwaring, BSc, CEng, MICE;
G. D. Mainwaring, BSc, CEng, MICE
Principal Engineer
Mott MacDonald Tunnels
Croydon
Search for other works by this author on:
C. R. Weeks, BSc, CEng, MICE;
C. R. Weeks, BSc, CEng, MICE
Director
Mott MacDonald
Singapore
Search for other works by this author on:
C. Brandsen, Ing
C. Brandsen, Ing
Project Manager
Tunnels, TEC vof
Veenendaal
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2000 Thomas Telford Ltd
2000
Proceedings of the Institution of Civil Engineers - Transport (2000) 141 (1): 9–24.
Citation
Mainwaring GD, Weeks CR, Brandsen C (2000), "The detailed design of the Medway Tunnel project". Proceedings of the Institution of Civil Engineers - Transport, Vol. 141 No. 1 pp. 9–24, doi: https://doi.org/10.1680/tran.2000.141.1.9
Download citation file:
515
Views
Suggested Reading
Impact resistance of fibre-reinforced concrete
Proceedings of the Institution of Civil Engineers - Structures and Buildings (February,2009)
Extended finite-element analysis of fractures in concrete
Proceedings of the Institution of Civil Engineers - Engineering and Computational Mechanics (December,2008)
Evaluation of seismic retrofit to existing concrete structures by fluid viscous dampers
Proceedings of the Institution of Civil Engineers - Structures and Buildings (February,2002)
Strut-and-tie models obtained by way of topological optimisation
Proceedings of the Institution of Civil Engineers - Structures and Buildings (March,2021)
A vector intensity measure to reliably predict maximum drift in low- to mid-rise buildings
Proceedings of the Institution of Civil Engineers - Structures and Buildings (March,2018)
Related Chapters
FIELD TRIALS ON COVERCRETE MONITORING SENSORS: A TEMPERATURE CORRECTION PROTOCOL FOR CONDUCTIVITY MEASUREMENTS
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
INTERNATIONAL DEVELOPMENTS IN THE FIELD OF AGEING MANAGEMENT OF NUCLEAR POWER INFRASTRUCTURE
Role of Concrete in Nuclear Facilities
CRITERIA FOR AND PREDICTION OF LIMIT STATES OF DEGRADATION OF REINFORCED CONCRETE STRUCTURES
Role of Concrete in Nuclear Facilities
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.