Alobaidi I.M., Ghataora G.S., Billam J. and Coombs R.
The use of permeable materials for backfilling trenches. Aug., 151–159
Benn J.R. see Whitbread J.E., Benn J.R. and Hailes J.M.
Biggart A.R., Hawley J. and Townsend J.
The North Hollywood Project, Los Angeles. Feb., 43–56
Billam J. see Alobaidi I.M., Ghataora G.S., Billam J. and Coombs R.
Brackstone M. see Marsden G., Chatterjee K., Lyons G. and Brackstone M.
Brandsen C. see Mainwaring G.D., Weeks C.R. and Brandsen C.
Brown R.H. Bosnia and Herzegovina: revitalizing a railway system after war. Nov., 161–169
Burrow M.P.N., Evdorides H.T. and Snaith M.S.
Road marking assessment using digital image analysis. May, 107–112
Cannon R. see Kathmann T. and Cannon R.
Chatterjee K. see Marsden G., Chatterjee K., Lyons G. and Brackstone M.
Coombs R. see Alobaidi I.M., Ghataora G.S., Billam J. and Coombs R.
Court D.J.
Medway Tunnel—construction. Feb., 25–34
Eaglestone A. see Thompson D., Eaglestone A., Tong C.O. and Wong S.C.
Evdorides H.T. see Burrow M.P.N., Evdorides H.T. and Snaith M.S.
Ferreira L. see Zhang Y.-J., Murray M. and Ferreira L.
Flaig K.D. and Lark R.J.
The development of UK bridge management systems. May, 99–106
Freer-Hewish R.J. see Holt C.C, Freer-Hewish R.J and Ghataora G.S
Ghataora G.S. see Alobaidi I.M., Ghataora G.S., Billam J. and Coombs R. see Holt C.C., Freer-Hewish R.J. and Ghataora G.S
Hailes J.M. see Whitbread J.E., Benn J.R. and Hailes J.M.
Hawley J. see Biggart A.R., Hawley J. and Townsend J.
Hodgson G. and Rankin R.K.
Partnership working: case study of a successful partnering relationship on a major UK DBFO road project. Aug., 143–149
Holt C.C., Freer-Hewish R.J., Ghataora G.S.
The use of lime-treated British clays in pavement construction. Part 2: The effect of mellowing on the stabilization process. Nov., 207–216
Kathmann T. and Cannon R.
The use of active speed warning signs. May, 67–78
Khalid H.A.
Evaluation of asphalt fatigue properties in the laboratory. Nov., 171–178
Lark R.J. see Flaig K.D. and Lark R.J.
Leiper Q., Roberts T. and Russell D.
Geotechnical engineering for the Medway Tunnel and approaches. Feb., 35–42
Lunniss R.C.
Medway Tunnel—planning and contract administration. Feb., 1–8
Lyons G. see Marsden G., Chatterjee K., Lyons G. and Brackstone M.
Madelin K.B.
Roads, reality and the customer. Nov., 179–186
Mainwaring G.D., Weeks C.R. and Brandsen C.
The detailed design of the Medway Tunnel project. Feb., 9–24
Marsden G., Chatterjee K., Lyons G. and Brackstone M.
Infrastructure and transportation in the twenty-first century—ever-increasing circles? Nov., 195–206
Murray M. see Zhang Y.-J., Murray M. and Ferreira L.
Nikolaides A.
Rutting and volumetric properties of SMA mixtures. Aug., 135–141
Osbaldeston S. and Phear A.
New A557, Widnes—alternative embankment foundations. Aug., 113–122
Phear A. see Osbaldeston S. and Phear A.
Rankin R.K. see Hodgson G. and Rankin R.K.
Roberts T. see Leiper Q., Roberts T. and Russell D.
Rogers M.
The basis for Dublin's transportation policy beyond 2000. Aug., 123–134
Russell D. see Leiper Q., Roberts T. and Russell D.
Snaith M.S. see Burrow M.P.N., Evdorides H.T. and Snaith M.S.
Thompson D., Eaglestone A., Tong C.O. and Wong S.C.
Development of a transport model for east Kowloon, Hong Kong. May, 87–97
Tong C.O. see Thompson D., Eaglestone A., Tong C.O. and Wong S.C.
Townsend J. see Biggart A.R., Hawley J. and Townsend J.
Weeks C.R. see Mainwaring G.D., Weeks C.R. and Brandsen C.
Whitbread J.E., Benn J.R. and Hailes J.M.
Cost-effective management of scour-prone bridges. May, 79–86
Wong S.C. see Thompson D., Eaglestone A., Tong C.O. and Wong S.C.
Zhang Y.-J., Murray M. and Ferreira L.
Modelling rail track performance: an integrated approach. Nov., 187–194
