When measuring the noise and vibration from trains it is necessary first to establish how much data needs to be collected in order to achieve the required level of accuracy. Existing measurement standards tend to concentrate on controlling the train speed, the condition of the track and the condition of the train, but do not indicate how much data is required. This paper sets out to establish how much data is necessary for a particular type of measurement situation. Using the measured distributions of noise and vibration data, the Monte Carlo method is used to determine the amount the sample mean may vary from the population mean as a function of the number of samples. This information can then be used to determine the number of trains that would need to be measured to achieve a particular level of accuracy. It has been found that if noise measurements are taken for trains comprising identical vehicles then, if the sample mean is to be within approximately ±1 dB of the true value, then measurements would need to be made on at least 34 vehicles. When the trains contain different types of vehicle, the number of measurements increases. With ground-borne vibration it was found that at least 40 trains, each comprising nine coaches and a locomotive, were required to be able to measure the vibration dose value with a degree of accuracy that is equivalent to ±1 dB.
Article navigation
May 2002
Research Article|
May 01 2002
Reducing the errors when measuring railway noise and vibration
R. R. K. Jones
R. R. K. Jones
AEA Technology Rail
London
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 17 2001
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Transport (2002) 153 (2): 103–109.
Article history
Received:
July 17 2001
Citation
Hardy AEJ, Jones RRK (2002), "Reducing the errors when measuring railway noise and vibration". Proceedings of the Institution of Civil Engineers - Transport, Vol. 153 No. 2 pp. 103–109, doi: https://doi.org/10.1680/tran.2002.153.2.103
Download citation file:
245
Views
New and popular articles
Suggested Reading
Probabilistic empirical model for train-induced vibrations
Proceedings of the Institution of Civil Engineers - Structures and Buildings (October,2015)
Overall railway infrastructure effectiveness (ORIE): A case study on the Swedish rail network
Journal of Quality in Maintenance Engineering (March,2009)
Reliability allocation of railway system based on fault tree
Railway Sciences (September,2025)
Etihad Rail: a new way to change a business landmark in the United Arab Emirates
Teaching Notes (November,2016)
Etihad Rail: a new way to change a business landmark in the United Arab Emirates
Emerald Emerging Markets Case Studies (November,2016)
Related Chapters
On horizontal variability in lime-cement columns in deep mixing
Risk and Variability in Geotechnical Engineering
Partial factors calibration based on reliability analyses for square footings on granular soils
Risk and Variability in Geotechnical Engineering
Reliability-based design applied to retaining walls
Risk and Variability in Geotechnical Engineering
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
