Putney Railway Bridge is one of seven railway bridges crossing the River Thames in the Greater London Area and is one of only four providing a cross-London route. This paper covers the history of the bridge, the problems that developed in the bridge, the solutions developed to resolve those problems and the refurbishment works to the bridge. The bridge was built in 1888 and is an eight-span, half through, ‘four system’ lattice truss bridge carried on cast-iron caisson piers. It carries London Underground Limited's (LUL) District Line approximately seven metres above the Thames just south of Putney Bridge Station. Although intended to have excess capacity, war damage, corrosion, design errors and finally a major ship impact caused the line over the bridge to be closed temporarily. The repair and strengthening works incorporated the most up to date analysis techniques and a Quantified Risk Assessment. They addressed fundamental design omissions as well as deterioration and damage. The works were planned and executed to cause the minimum disruption to rail traffic and included the construction of mass sprung fenders, repair of a fractured caisson, replacement of the bearings, and extensive strengthening including the addition of cross girders.
Article navigation
November 2002
Research Article|
November 01 2002
The refurbishment of Putney Railway Bridge
G. T. Bessant
G. T. Bessant
Bridges and Structures Engineer
Infraco SSL, London Underground Ltd
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
September 19 2001
Accepted:
January 15 2002
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Transport (2002) 153 (4): 209–218.
Article history
Received:
September 19 2001
Accepted:
January 15 2002
Citation
Bessant GT (2002), "The refurbishment of Putney Railway Bridge". Proceedings of the Institution of Civil Engineers - Transport, Vol. 153 No. 4 pp. 209–218, doi: https://doi.org/10.1680/tran.2002.153.4.209
Download citation file:
New and popular articles
Suggested Reading
Great Western railway electrification, UK: civil engineering works
Proceedings of the Institution of Civil Engineers - Civil Engineering (September,2020)
Bridgeworks on the East London railway line extension, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2008)
Reconstruction of the Welsh Highland Railway, Snowdonia
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2008)
Innovative digital design delivery for the Ordsall Chord in Manchester, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (April,2018)
Repair of two riveted steel plate girder railway bridges
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2011)
Related Chapters
Census Forecasting in an Inpatient Rehabilitation Facility
Advances in Business and Management Forecasting
CONDITION ASSESSMENT OF RC STRUCTURES BY LINEAR POLARIZATION AND BY ACCELERATED CARBONATION EXPERIMENTS
Repair and Renovation of Concrete Structures: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–6 My 2005
Interactions of Community Development and Legal Reforms in Rehabilitating Juvenile Offenders in Zambia
Community Development Practice in Africa: Putting Theory Into Practice
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
