Bridge D141 carries the District line of London Underground over the River Lea and Bow Creek in the east of London in the Greater London area. The District line is one of the three west-to-east lines of the London Underground, the others being the Central line and the Jubilee line. As such, it is of major economic importance. The bridge was built in 1888, and is of relatively light construction compared with modern bridges. The track form was of short longitudinal timbers, and corrosion had reduced the live load capacity. The light form, coupled with the short timbers, gave constant track and ride problems. As the bridge spanned two waterways, maintenance was difficult, and major works became necessary to avoid restrictions. The site being ‘landlocked’ hampered refurbishment works, and closure was not an option, as to do so would have caused unacceptable economic effects. This paper covers the history of the bridge, the problems that developed in the bridge, the solutions to the problems—both structural and in the track form—the refurbishment and strengthening of the bridge, and the problems encountered in the work.
Article navigation
November 2007
Research Article|
November 01 2007
Refurbishment of London Underground bridge D141
G. T. Bessant, CEng, FICE, AMIStructE, MCILT;
G. T. Bessant, CEng, FICE, AMIStructE, MCILT
Bridges and Structures Engineer, London Underground, London
UK
Search for other works by this author on:
P. Williams, CEng, MICE
P. Williams, CEng, MICE
Former Premises and Structures Engineer, London Underground, London
UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
October 23 2006
Accepted:
July 13 2007
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2007 Thomas Telford Ltd
2007
Proceedings of the Institution of Civil Engineers - Transport (2007) 160 (4): 157–164.
Article history
Received:
October 23 2006
Accepted:
July 13 2007
Citation
Bessant GT, Williams P (2007), "Refurbishment of London Underground bridge D141". Proceedings of the Institution of Civil Engineers - Transport, Vol. 160 No. 4 pp. 157–164, doi: https://doi.org/10.1680/tran.2007.160.4.157
Download citation file:
244
Views
New and popular articles
Suggested Reading
Great Western railway electrification, UK: civil engineering works
Proceedings of the Institution of Civil Engineers - Civil Engineering (September,2020)
Bridgeworks on the East London railway line extension, UK
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2008)
On the ropes: civil engineers get closer to rail bridges
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2006)
Great Western electrification programme, UK: Bridge Street overbridge reconstruction
Proceedings of the Institution of Civil Engineers - Civil Engineering (July,2020)
Lateral dynamic bridge deck–pier interaction for ultra-high-speed Hyperloop train loading
Proceedings of the Institution of Civil Engineers - Bridge Engineering (November,2019)
Related Chapters
PERFORMANCE, REPAIR NEEDS AND RENOVATION OF PLAIN CONCRETE PAVEMENT OF AN INTERNATIONAL AIRPORT
Challenges of Concrete Construction: Volume 3, Repair, Rejuvenation and Enhancement of Concrete: Proceedings of the International Seminar held at the University of Dundee, Scotland, UK on 5–6 September 2002
A Space for Everyone and Everyone in the Space: Re-Designing Existing Library Space to Inspire Collaboration
The Future of Library Space
Location is Crucial in Retrofit: Strategy Selection in Different Regions
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.