In the early 1990s Cambridgeshire County Council considered the implementation of a road user charging scheme for the city of Cambridge, UK. This involved the trial of a congestion metering scheme, a form of road user charging. Cambridge presented an ideal opportunity for the implementation of a road user charging scheme not least in terms of its congestion problem, the free-standing nature of the city and the fact that at the time, the local authority in the form of the council was sympathetic to the objectives of road user charging. The scheme did not, however, proceed and many reasons have been put forward as to why this was the case—issues such as not all the alternatives having been exhausted, the level of sophistication of the proposed scheme and the lack of a similar scheme to consider elsewhere. Fifteen years later, Cambridgeshire is once again considering the whole issue of road user charging. As such, the aim of this paper is to assess how the authority is proceeding this time round: what type of technology is being considered; how the politicians are presenting the concept to the local population and what are they doing differently from the first time round, in terms of consultation; and most importantly, what provision for alternative means of transport will be made and how this relates to the potential success of any road user charging scheme? The paper aims to conclude on what lessons can be learnt in terms of other cities considering the implementation of a road user charging scheme.
Article navigation
August 2008
Research Article|
August 01 2008
Cambridge's experience of road user charging: lessons learned
S. Ison, MA PhD, CMILT;
S. Ison, MA PhD, CMILT
Professor
Transport Studies Group, Loughborough University
UK
Search for other works by this author on:
G. Hughes, MSc, DipTP, DMS, MRTPI, CMILT;
G. Hughes, MSc, DipTP, DMS, MRTPI, CMILT
Director of Sustainable Infrastructure
Cambridgeshire County Council
Cambridge, UK
Search for other works by this author on:
R. Tuckwell, MSc CEng MICE, FCILT, MIHT
R. Tuckwell, MSc CEng MICE, FCILT, MIHT
Strategic Transport Adviser
Cambridgeshire County Council
Cambridge, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
January 09 2008
Accepted:
May 07 2008
Online ISSN: 1751-7710
Print ISSN: 0965-092X
© 2008 Thomas Telford Ltd
2008
Proceedings of the Institution of Civil Engineers - Transport (2008) 161 (3): 135–141.
Article history
Received:
January 09 2008
Accepted:
May 07 2008
Citation
Ison S, Hughes G, Tuckwell R (2008), "Cambridge's experience of road user charging: lessons learned". Proceedings of the Institution of Civil Engineers - Transport, Vol. 161 No. 3 pp. 135–141, doi: https://doi.org/10.1680/tran.2008.161.3.135
Download citation file:
Suggested Reading
Extent of capacity loss resulting from pavement distress
Proceedings of the Institution of Civil Engineers - Transport (February,2005)
Road user charging trends in Asia
Proceedings of the Institution of Civil Engineers - Transport (November,2006)
Estimating vehicle speed using single inductive loop detectors
Proceedings of the Institution of Civil Engineers - Transport (February,2001)
Determining the quality of highway service caused by rainfall
Proceedings of the Institution of Civil Engineers - Transport (October,2014)
Performance of junctions with a high motorcycle proportion
Proceedings of the Institution of Civil Engineers - Transport (May,2009)
Related Chapters
Pedestrian flow and capacity: the Highway Capacity Manual*
Pedestrian Facilities: Geometric design for safety and mobility
13 Pedestrian flow and capacity: the highway capacity manual
Pedestrian facilities: Engineering and geometric design
Facilities for inclusive mobility: geometric design guidelines
Pedestrian Facilities: Geometric design for safety and mobility
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.