The UK Highways Agency awarded a contract to Jackson Civil Engineering in July 2006 to widen the M1 motorway between junction 31 and junction 32 in South Yorkshire to a dual 4-lane motorway standard with provision for a future fifth lane on the southbound carriageway. This was a design-and-build contract, with the design being a development of an outline design produced by Hyder on behalf of the Highways Agency. Jackson Civil Engineering employed URS Corporation as its designer; the design team was based in its office in Bedford. The design period was 18 weeks with a 42-week construction period. The scheme was constructed within the existing corridor to negate the requirement for land take, thus enabling the scheme to be brought to construction phase much more quickly. This led to some interesting challenges on slope design and the scheme also required a number of Departures from Standards especially on alignment, including setback, with some relaxations also being required. Construction commenced in January 2007 and the works were substantially complete to allow for all lanes to be open to traffic by Christmas 2007, albeit under a temporary 50 miles/h (80 km/h) speed limit due to communications equipment issues; works were fully completed in January 2008. This paper describes both the design and construction phases.
Article navigation
November 2013
Research Article|
November 01 2013
Widening of the M1 motorway, UK, from junctions 31 to 32
Andrew Burton, BSc, MCIHT
Andrew Burton, BSc, MCIHT
Regional Manager
Jackson Civil Engineering, Selby, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Revision Received:
May 05 2010
Accepted:
May 05 2010
Online ISSN: 1751-7710
Print ISSN: 0965-092X
ICE Publishing: All rights reserved
2013
Proceedings of the Institution of Civil Engineers - Transport (2013) 166 (6): 344–353.
Article history
Revision Received:
May 05 2010
Accepted:
May 05 2010
Citation
Burton A (2013), "Widening of the M1 motorway, UK, from junctions 31 to 32". Proceedings of the Institution of Civil Engineers - Transport, Vol. 166 No. 6 pp. 344–353, doi: https://doi.org/10.1680/tran.10.00032
Download citation file:
Suggested Reading
Design and construction of high-rise modular buildings based on recent projects
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2019)
Gateshead Millennium Bridge, UK: fabrication, assembly and erection
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2003)
Eight footbridges in the Rembrandt Park in Amsterdam
Proceedings of the Institution of Civil Engineers - Bridge Engineering (June,2006)
Procurement, design and construction of the Clyde Arc, Glasgow
Proceedings of the Institution of Civil Engineers - Bridge Engineering (March,2009)
Structural design of high rise volumetric building systems using hot-rolled steel
Proceedings of the Institution of Civil Engineers - Civil Engineering (August,2019)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
