As traffic on Britain's railways has grown, the system is approaching capacity and moving towards 24/7 operation. This increases wear and tear, and reduces access for maintenance, renewal and enhancement. Increasing costs of renewals and enhancements are also questioned, amid funding scarcity. Alongside predictive and preventive maintenance, improved planning and implementation of renewals and enhancements are needed, balancing network availability for train operations with cost-effective construction activities. Typically, extended track possessions maximise construction efficiency but also reduce network availability for operations, whereas short possessions maintain network availability but are least efficient for construction purposes. The effects of infrastructure activities on network availability have typically been monitored and assessed retrospectively, rather than being planned proactively to maximise network availability or to optimise the trade-offs between network availability and engineering efficiency. This paper reviews the current situation and identifies opportunities to enhance planning processes and the balance between network availability and engineering efficiency.
Article navigation
August 2020
Research Article|
July 12 2019
Balancing railway network availability and engineering access
John Armstrong, BE, MSc, EngD;
John Armstrong, BE, MSc, EngD
Senior Research Fellow, Transportation Research Group, University of Southampton, UK (corresponding author: j.armstrong@soton.ac.uk)
Search for other works by this author on:
John Preston, BA, MA, PhD
John Preston, BA, MA, PhD
Professor, Head of Group, Transportation Research Group, University of Southampton, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
March 26 2019
Accepted:
June 03 2019
Online ISSN: 1751-7710
Print ISSN: 0965-092X
ICE Publishing: All rights reserved
2019
Proceedings of the Institution of Civil Engineers - Transport (2020) 173 (4): 209–217.
Article history
Received:
March 26 2019
Accepted:
June 03 2019
Citation
Armstrong J, Preston J (2020), "Balancing railway network availability and engineering access". Proceedings of the Institution of Civil Engineers - Transport, Vol. 173 No. 4 pp. 209–217, doi: https://doi.org/10.1680/jtran.19.00045
Download citation file:
New and popular articles
Suggested Reading
Channel Tunnel Rail Link section 1: track and power supply
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2003)
Railway track performance study using a new testing facility
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (October,2012)
Metros under construction around the world
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering (January,2001)
Great Western railway electrification, UK: civil engineering works
Proceedings of the Institution of Civil Engineers - Civil Engineering (September,2020)
Extending London's Docklands Light Railway to Woolwich
Proceedings of the Institution of Civil Engineers - Civil Engineering (May,2010)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
