Open figure viewer
Conventional traffic modelling and forecasting and economic testing led to the selection of a design for the M25/M1 interchange which, to some extent, compromised on the strategic function of the road network. This has favoured local traffic movement on the M25 and contributed to pressures for development within the M25 corridor which are already much in evidence.
This content is only available via PDF.
© Thomas Telford and ICE
1992
