Skip to Main Content
Keywords: Alternative
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (4): 185–194.
Published: 01 November 1999
... schemes do not incorporate a monetary value to the loss of landscape caused by a new road. The contingent valuation method (CVM) o€ers the opportunity to derive a value equal to the preservation bene®ts of alternative schemes which do not adversely a€ect the landscape. This study identi®es the values...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1997) 123 (4): 262.
Published: 01 November 1997
... overall. 262 Paper published: Proc. Instn Civ. Engrs, Transp., 1996, 117, Nov., 248 255 TRANSPORT SURFACE INLAND RESEARCH ALTERNATIVE FUEL EFFICIENCY POLICIES WATERWAYS CANALS RIVERS © Thomas Telford and ICE 1997 ...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (3): 177–185.
Published: 01 August 1996
.... It tration with the track at A andB, but optical is common for the transition curve tobe alternatives may alsobe employed. A hydraulic designedtohavealinearchange of curvature actuator is used to make the track adjustment. between constantcurvaturesections,but more This is controlled by a servo valve, which...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (3): 153–164.
Published: 01 August 1994
... ALTERNATIVE WORKS BASINS INSTALLATION EXCAVATIONS REMOVAL OBSERVATIONAL DOCKLANDS LIMEHOUSE DOCKLANDS LONDON LIMEHOUSE BASIN UK © Thomas Telford and ICE 1994 The constructionof Limehouse Link tunnel Engrs, Proc. Instn Tramp., Civ. 1994, 105,Aug., 153-164 K. R. Farley, BSc, MICE...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (1): 51–59.
Published: 01 February 1992
... for the year 2010. The study was completed in under a year. This timescale was achieved by developing a strategic sketch-planning model, which enabled the performance of alternative strategies to be tested against a range of objectives and in the context of different scenarios for future development. A range...

or Create an Account

Close Modal
Close Modal