Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-10 of 10
Keywords: Buildings
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (2004) 157 (4): 211–220.
Published: 01 November 2004
... passengers from the European continent when the Channel Tunnel Rail Link is complete. In addition it is sited at the junction of major roads, and its existing buildings date from the 1860s. This paper describes the history of the station, the constraints of building a new station round operating railways...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (2): 55–70.
Published: 01 May 1999
...J L FRANKLIN © Thomas Telford and ICE 1999 BRITISH RAIL KVAERNER PROCESS JOHN BROWN RAILWAYS TERMINALS INTERNATIONAL STATIONS BUSINESS BUILDINGS STRUCTURES LAYOUT PLANNING DESIGN PROJECTS SITES BROWNFIELD DEVELOPMENT COMMERCIAL PLATFORMS TRAINS SERVICES...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (2): 71–91.
Published: 01 May 1999
... was set out in the associated paper1 and respective responsibilities were continued throughout this phase of the overall project. Keywords: railway systems; building structure & design; contracting Architectural detailed design and construction Freezing the layouts on 1:100 architectural drawings...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (1): 1–8.
Published: 01 February 1999
...L F DUNCOMBE; BAA © Thomas Telford and ICE 1999 HEATHROW AIRPORT BRITISH AIRPORTS AUTHORITY BAA AIRPORTS EUROPIER INVESTMENT TERMINALS PLANNING CONSTRUCTION TERMINAL 1 TERMINAL 2 APRONS STANDS AIRCRAFT RUNWAYS PIERS JETTIES SERVICES BUILDINGS DESIGN COSTS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (2): 148–150.
Published: 01 May 1996
...D WILLIAMS; M NOAKES; T BAILEY; BAA; NEC © Thomas Telford and ICE 1996 BRITISH AIRWAYS AUTHORITY BAA AIRPORTS DEVELOPMENT BUILDINGS TERMINALS DESIGN IMPLEMENTATION REGIONAL CONTRACTS TENDERING NEC NEW ENGINEERING COSTS PROJECTS SOUTHAMPTON ENGLAND UK...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1995) 111 (2): 97–104.
Published: 01 May 1995
...R DE NEUFVILLE; R D NEUFVILLE; MIT © Thomas Telford and ICE 1995 MASSACHUSETTS INSTITUTE OF TECHNOLOGY AIRPORTS BUILDINGS PASSENGERS DESIGN TRAFFIC TRANSPORT TERMINALS AVIATION FACILITIES MIDFIELD PEOPLE MOVERS TRANSFER PLANNING Designing airport passenger buildings...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1995) 111 (1): 24–32.
Published: 01 February 1995
...J G BOAK © Thomas Telford and ICE 1995 BALFOUR BEATTY TRAMS TRANSPORT SUPERTRAMS ROUTES CIVIL WORKS CITIES TRACK TRACKWORK CONSTRUCTION TECHNIQUES METHODS REDUCTION NOISE VIBRATIONS BUILDINGS ADJACENT BRIDGES VIADUCTS UNDERPASSES TRAMWAYS TRAMCARS DOUBLE...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (2): 79–89.
Published: 01 May 1994
... (equivalent to a four storey building). Geotechnical investigation 13. Ground conditions were complex and variable with a sequenceof made ground overlying Thames Gravel,London Clay, Woolwich and Reading Beds (WRB),Thanet Sands and chalk bedrock. Structural designof the tunnel would be dictated...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (1): 21–30.
Published: 01 February 1994
... is included in the easterly verge, and Engineer, City terminal building, associated aprons and taxi- provision for horse riding has been made on the Engineer and ways, ancillary terminal developments, access roads and landscaping works. Planning permission was grantedin 1987. Two additional applications were...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (4): 243–252.
Published: 01 November 1992
...W. G. Billing, BA(Hons), MRAeS; B. V. Latter, BSc(Eng), ACGI, FICE Air traffic control towers are specialist-use buildings of varying degrees of complexity, and considerable differences in size. They do, however, share many common features in both construction, and therefore design...
