Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: CABLES
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1997) 123 (4): 241–248.
Published: 01 November 1997
... 248 Paper 11483 Written discussion closes 15 April 1998 s During construction and for the first year of operation of the Second Severn Crossing, the dynamic response of the cablestayed section of the structure was monitored. This gave valuable insight into the dynamic behaviour of cable-stayed bridges...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (4): 291–295.
Published: 01 November 1996
...- overhead power cables and supports, and also face level of the airport terminal building, that the transient obstructions, that is theMetro is the concourselevel (see Fig.2). train. Every eventuality had tobe considered, 22. Various means of accessing the airport including the consequencesof a train...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1995) 111 (1): 24–32.
Published: 01 February 1995
... GRADIENTS CURVES CONTRACTS WALLS RETAINING BALLAST PAVED RAILS PAVING MACHINERY POWER SYSTEMS ELECTRICITY CABLES CONDUCTORS CONTACT WIRE OVERHEAD ELECTRIC LIGHT RAIL RAILWAYS LIGHT SIGNALS SHEFFIELD SOUTH YORKSHIRE UK Pmc. Insfn Civ. Engrs Tronsp. 1995,111. Feb., 24-32...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (2): 111–118.
Published: 01 May 1994
... project However, access to utilities pipes and cables Feb. Royal Assent to Acts1and 2 beneath the tracks would not be possible Sep. 1st stage tender documents issuetdo short list without severe disruption to Metrolink oper- Nov. Orders placed for service diversions ations. An attempt was made...
