Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: CLIENTS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
WATERLOO INTERNATIONAL TERMINAL: DETAILED DESIGN AND CONSTRUCTION.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (2): 71–91.
Published: 01 May 1999
... was a critical step in allowing detail design to proceed on the three main fronts of the civils/structural, mechanical and electrical (M&E), and architectural disciplines. From early 1991, the procedure for freezing of the 1:100s was a joint signing-o by the client, the European Passenger Services (EPS...
Journal Articles
THE LIMEHOUSE LINK TUNNEL. DISCUSSION OF PAPERS 10207, 10208 & 10212.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (1): 70.
Published: 01 February 1996
... on the structure, incentive for a contractor to pursue alterna- which, Martin Stevenson explained, were par- tives, especially in a measured situation. In ticularly large becauseof the locked-in stresses reply, Mr Blyth said that a client firsnteeded a in the Woolwich and ReadingBeds. As a result, design on which...
Journal Articles
INFRARAIL SEMINARS: MANCHESTER, SEPTEMBER 1994. (PART 1: MAINTENANCE AND RENEWAL OF RAILWAY INFRASTRUCTURE; PART 2: THE CIVIL ENGINEERING ASPECTS OF STREET-RUNNING LIGHT RAILWAYS). SEMINAR REPORT.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (1): 63–66.
Published: 01 February 1996
...C O FREDERICK; A P YOUNG; N OGILVIE; MARPAS © Thomas Telford and ICE 1996 RAILTRACK BRITISH RAIL BR INFRASTRUCTURE SERVICES RAILWAYS INFRASTRUCTURE MAINTENANCE RENEWAL CONTRACTORS CONTRACTS CLIENTS TRACK SERVICES CIVIL ENGINEERING PRIVATISATION REORGANISATION...
Journal Articles
RECONSTRUCTION OF THE FLOOD DAMAGED NESS VIADUCT - INVERNESS. TECHNICAL NOTE.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1995) 111 (2): 135–137.
Published: 01 May 1995
...W R SCOTT BRIDGES VIADUCTS RECONSTRUCTION FLOODS DAMAGE MASONRY DESIGN CONSTRUCTION CLIENTS CONSULTANTS ARCHES RAILWAYS COLLAPSE NESS INVERNESS SCOTLAND UK Reconstructionof the flood damaged Ness viaducblnverness Proc. Instn Ciu. Engrs Tronsp. 1995, I l l , May 135...
