Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-5 of 5
Keywords: Feasibility
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
PROPOSALS FOR DEALING WITH POTENTIAL POLLUTION RESULTING FROM AIRCRAFT DE-ICING AT MANCHESTER AIRPORT.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (2): 117–121.
Published: 01 May 1996
.... The catch- ment A flowswere diverted to theBollin outfall sewer. The apron areas constructed within the original TimperleyBrook catchment area dis- charge to theBollin outfall sewer. Biological oxygen demand (BOD): 10 mg/l. Ammonia: 2 mg/l. No visible sign of oil or grease. Feasibility study The water...
Journal Articles
MANCHESTER AIRPORT TERMINAL 2: TERMINAL INFRASTRUCTURE. DISCUSSION. (ALSO INCLUDES CORRIGENDUM).
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (3): 233.
Published: 01 August 1994
..., known aCsar Park East, was 61. Since the T2 Feasibility Study further designed by the terminal design consultant, work has been carried out and the Airport s Scott Brownrigg& Turner. High-mast lighting Development strategy to 2005 has been provides illumination, and extensive planting published...
Journal Articles
MANCHESTER AIRPORT TERMINAL 2: TERMINAL INFRASTRUCTURE. (N.B. CORRIGENDUM WITH DISCUSSION IN VOL. 105, ISSUE 3, AUG 1994, P233.).
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (1): 21–30.
Published: 01 February 1994
.... Afterhearing opening state- Written discussion ments, the inspector adjourned the inquiry to closes 15 April 1994 international passenger terminal is allow discussions to takeplace between the described, with emphasis on thework parties. By the time itreconvened on 22 Novem- carried out during the feasibility...
Journal Articles
Birmingham Eurohub concept and evolution
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (3): 157–169.
Published: 01 August 1993
... and methodof operation of each ter- together with a fourth dimension in that this minal option proposed, together with had to be done against a severe time limitation. dedicated apron and airfield provision ( b ) provide a comprehensive assessment of the Feasibility study impact of the new terminal proposal...
Journal Articles
Expansion of Manchester Airport
Available to Purchase
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (2): 79–86.
Published: 01 May 1992
.... Expansion Airports Planning Design Management Development Terminals Transport Feasibility Studies Infrastructure Manchester UK © Thomas Telford and ICE 1992 Manchester Airport Expansionof Manchester Airport L.Congdon, BA, MTD, MCIT, and A. Taylor, DipArch, DipTP, RIBA...
