Keywords: LIME
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (1): 65–66.
Published: 01 February 1994
...D C HEATH; SIR P INNES The applicationof lime and cemenstoil stablization at BAA airports c.D. Heath, FICE, FIHT PYOCI.nstn Civ. Engrs Transp., 1994, 105, Feb., 65-66 Paper 9817 Paper published : W Sir Peter Innes, Scott Wilson Kirkpatrick & Partners Paragraph 13of the Paper refers briefly...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (2): 75–81.
Published: 01 May 1993
... his method of operation carefully. In addition the earthworks design called for 600 mm of capping. The Contractor chose to construct a capping layer of 250 mm of lime stabilized material overlaid with 350 mm of selected crushed rock over some 40% of the scheme. Elsewhere, where capping was specified...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (1): 11–50.
Published: 01 February 1992
... at Stansted; reference is also made to work at Heathrow involving Gravel/Brickearth deposits and at Glasgow where soft clay deposits occur. The dual use of both lime and cement to modify and strengthen the natural subgrades and earthwork formation are described together with summaries of the main control...

or Create an Account

Close Modal
Close Modal