Keywords: REMEDIAL
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (3): 153–161.
Published: 01 August 1999
...K G HIGGINS; H E EDMONDS; D SILVA; P R VAUGHAN; J PHILPOTT © Thomas Telford and ICE 1999 GEOTECHNICAL CONSULTING GROUP LONDON UNDERGROUND IMPERIAL COLLEGE STATIONS RAILWAYS UNDERGROUND METROPOLITAN LINE INVESTIGATIONS MONITORING WORKS REMEDIAL DAMAGE STRUCTURAL BRICKS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (4): 278–290.
Published: 01 November 1996
...J T DUFFELL; J K PAN © Thomas Telford and ICE 1996 HERTFORDSHIRE UNIVERSITY ROADS MINOR DETERIORATION CAUSES MAINTENANCE SURVEYS METHODS MANUAL MEASUREMENT PROFILES SKIDS SKIDDING RESISTANCE DEFLECTION SAFETY TREATMENT REMEDIAL TESTS MACHINERY MANAGEMENT MODELS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (2): 106–108.
Published: 01 May 1996
...B DIMBYLOW; D O NEILL; J M PEARSON © Thomas Telford and ICE 1996 BALFOUR MAUNSELL DERBYSHIRE CONSULTING AIRPORTS WATER SURFACE POLLUTION CONTROL DEICING DEICANTS STORAGE TEMPORARY PUMPS PUMPING DISPOSAL RIVERS CONSTRUCTION MEASURES REMEDIAL AIRCRAFT CHEMICALS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (2): 83–93.
Published: 01 May 1993
... in the stress free condition of the continuous-welded rail, have enabled line speed to be maintained in situations where, previously, severe speed restrictions would have been imposed. These developments, together with computer designed preventive and remedial works schemes, ontrack machinery control...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (4): 253–258.
Published: 01 November 1992
... the present bridge assessment programme has been with respect to parapet capacities. This equally applied to the North Bridge where the remedial works required to the defective parapets involved close consultations with numerous parties and the adoption of materials not commonly utilized in bridge...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (4): 259–262.
Published: 01 November 1992
... 1992 British Rail London Underground Oxfordshire County Council Fairclough Loading Lorries Bridges Roads Railways Motorways Underground Owners Ownership Costs Responsibility Remedial Works Measures Repairs Maintenance Assessment Government Local Government...

or Create an Account

Close Modal
Close Modal